would need to replace 5 bridges (canal and railway) to be dual width to enable two-way traffic and upgrade all the drainage for both surface water and severn trent sewerage all the way back to Warwick as current severn trent services are insufficient. There is currently no mains gas to the area so that would need to be installed as biomass, LPG and Oil are expensive to run when 'off grid', The train station has very few trains stopping and to increase services would cost a fortune. B1 is not a suitable site for housing