BASE HEADER

No

Preferred Options 2025

ID sylw: 90784

Derbyniwyd: 24/02/2025

Ymatebydd: Mr Michael Bond

Crynodeb o'r Gynrychiolaeth:

I object to the proposed site X1, east of Barford on several grounds;

This is inappropriate development in the Green Belt on a large scale which will have a detrimental impact on the village of Barford. There would be no or insufficient infrastructure such as a Doctor’s surgery, shops, or schools.

It would have a big impact on local traffic with the volume of additional traffic accessing an already busy Barford bypass. If the gravel extraction project goes ahead on an adjacent site the effect on local traffic with lorry movements would give major safety and traffic management problems.