BASE HEADER
No
Preferred Options 2025
ID sylw: 90817
Derbyniwyd: 24/02/2025
Ymatebydd: Ms Tamsyn Pickford
Crynodeb o'r Gynrychiolaeth:
I grew up in Wilmcote and have been shocked by these plans. The village and its essence will be evaporated by such a unfathomably large housing development. The villages involved will be transformed by such a high level of high density housing & without any of the attendant infrastructure that will be necessary for such a large number of homes. (Infrastructure that would have developed organically if the local villages had expanded at a natural pace.)
The local infrastructure is already at creaking point - especially vis-á-vis the traffic which is already very heavy on the A34 and A46.