BASE HEADER
No
Preferred Options 2025
ID sylw: 91107
Derbyniwyd: 25/02/2025
Ymatebydd: Mrs lisa mitchell
Crynodeb o'r Gynrychiolaeth:
our school system within shipston is over subscribed large class sizes and there is no facility for 6th form which means that children's education is disrupted having to attend out of county or Stratford. Transport costs are expected to be paid by the parent. The medical Centre is running at capacity and there is no provision to expand. The roads where the proposed planning are b roads country lanes. shipston has a one way system which is grid locked throughout the day houses will increase flooding, houses near to the tip will be cut off when the roads flood.