BASE HEADER
No
Preferred Options 2025
ID sylw: 91949
Derbyniwyd: 27/02/2025
Ymatebydd: Mr James OShea
Crynodeb o'r Gynrychiolaeth:
The road infrastructure through and around Stratford centre / bridge already can not cope with the level of traffic and this will only add further to the chaos and difficulties local residents and visitors will have to experience.
It is currently unsustainable in highways terms and is already at capacity.
The suggestion of the western relief road to assist with this has already had two Highways funding rejections and is too costly to deliver. We should not allocate sites on the expectation or assumption that these large scale projects will happen. There are other suitable locations for homes to go.