BASE HEADER
No
Preferred Options 2025
ID sylw: 92483
Derbyniwyd: 28/02/2025
Ymatebydd: Maxine Mayer
Crynodeb o'r Gynrychiolaeth:
I attach a technical report of the cumulative impact on traffic of the A429 and M40/J15 should this site be included in the SWLP.
ALSO
Sites either side of the A429 at Sherbourne and M40/J15 are being proposed to be brought forward for development (Richborough). National Highways already consider J15 is at max capacity in peak periods. We would wish to see these sites safeguarded for the expansion of J15. The SWLP should have/provide for this future ambition/vision.