BASE HEADER

Other

Preferred Options 2025

ID sylw: 93328

Derbyniwyd: 02/03/2025

Ymatebydd: Cllr David Armstrong

Crynodeb o'r Gynrychiolaeth:

Railway travel in the district is operating 'at capacity' (IDP). As such, for any sites requiring rail expansion the expansion should be seen as Critical or Essential (as defined in the IDP, Table 3.2) and occur before development.

The Severn Trent draft water resources management plan (ST 2024) and Drainage and Wastewater Management Plan (2023) are not cited in the plan. The Water Cycle Study referenced was not compiled using the latest housing growth estimates and makes no mention of the SWLP out to 2050. I am concerned the evidence used for water infrastructure is not aligned with expected housing.