BASE HEADER

No

Preferred Options 2025

ID sylw: 94245

Derbyniwyd: 03/03/2025

Ymatebydd: John Dinnie

Crynodeb o'r Gynrychiolaeth:

Shipston on Stour is unsuitable for large scale development due to lack of infrastructure and specific restrictions on the sites suggested above. Housing has already been provided well beyond that required by the Stratford on Avon Core Strategy. The entire area within the BUAB, with the exception of the reserve site, has been built out. Infrastructure has not kept pace with the increase in housing or population. This is laid out in more detail in 'Infrastructure needs' on the next page.