BASE HEADER
No
Preferred Options 2025
ID sylw: 94302
Derbyniwyd: 03/03/2025
Ymatebydd: Mr Jon Redhead
Crynodeb o'r Gynrychiolaeth:
This approach should only run for 15 years, and not the over 40 years that it now runs for. This would reduce the substantial need for unnecessarily high house building targets, and as needs will change greatly with the present long time duration. The infrastructure problems are not being addressed at all in most cases, and are falling far too short and inadequate to support the need to carry on building just housing alone. Green Belt land could never be considered as sustainable because once it is built on, it can never be regenerated, and loss immeasurable for future generations.