BASE HEADER
Yes
Preferred Options 2025
ID sylw: 94349
Derbyniwyd: 03/03/2025
Ymatebydd: Mr Trevor Pickard
Crynodeb o'r Gynrychiolaeth:
The proposed site is not within the Green Belt, is close to the M40 and J13 to which could be adapted to allow both north and south access and is in a sparsely populated area so development would not overload the infrastructure in the area. It is also in close proximity to SG09 and SG10.