BASE HEADER

Yes

Preferred Options 2025

ID sylw: 94356

Derbyniwyd: 03/03/2025

Ymatebydd: Mr Trevor Pickard

Crynodeb o'r Gynrychiolaeth:

The proposed site is not within the Green Belt, is in a sparsely populated area so development would not overload the local infrastructure and is also in close proximity to SG11.