BASE HEADER

No

Preferred Options 2025

ID sylw: 94662

Derbyniwyd: 03/03/2025

Ymatebydd: Mr Robert Griffiths

Crynodeb o'r Gynrychiolaeth:

Significant part of Fell Mill site routinely floods as intended (7 times 2024, twice Jan 2025). Important 'relief valve'. On these occasions roads at Honington and Shipston bridges flood - impassable by foot or vehicle. Flooding frequency increased in recent years. Development would reduce land absorption of water.

Travel from proposed Fell Mill site to all points north, south and west (inc Shipston, Moreton, Stratford) would use single lane bridges at Honington and Shipston. Barely suitable for existing traffic.

Limited buses to Stratford and Banbury from Shipston.

Recycling facility should be retained to avoid travel to distant sites - environment.