BASE HEADER

No

Preferred Options 2025

ID sylw: 94727

Derbyniwyd: 03/03/2025

Ymatebydd: David Gosling

Crynodeb o'r Gynrychiolaeth:

The increase in the size of JLR land (currently used as a test track) would lead to access requirements from Lighthorne Road. This would be totally inappropriate given the road network within the centre of Kineton to the south, which cannot be altered. To the north the junction with The Fosseway is a location with frequent vehicle accidents and significant highway reconfiguration would be required. The Lighthorne Road is also narrow and, again, would require major widening