BASE HEADER

No

Preferred Options 2025

ID sylw: 94953

Derbyniwyd: 03/03/2025

Ymatebydd: Mr Christopher Bull

Crynodeb o'r Gynrychiolaeth:

I disagree with the spatial growth strategy use of priority areas 1-3 as, whilst well intended, the outcome of this method has led to a growth distribution that contradict the stated Strategic objectives of the local plan for 2 key reasons.

1)They have led to the proposed SG01-08 sites along the route of the A46. Therefore creating a linear development along a road that will become dormitory neighborhoods for road commuters.

2) The priorities area sustainability argument relies on existing infrastructure like railway stations in historic town, this is flawed as the surrounding road infrastructure cannot sustain the existing traffic.