BASE HEADER

No

Preferred Options 2025

ID sylw: 95573

Derbyniwyd: 04/03/2025

Ymatebydd: Miss Beverley Booker

Crynodeb o'r Gynrychiolaeth:

The infrastructure required to enable building in this area would be very costly and probably done to a substandard quality, if left to the potential developers. The residents will be left with more shoddy homes with an increased risk of flooding and a risky walk or drive into the town over the small bridge.