BASE HEADER

No

Preferred Options 2025

ID sylw: 95916

Derbyniwyd: 04/03/2025

Ymatebydd: Mr STEVEN BLIWERT

Crynodeb o'r Gynrychiolaeth:

This area is completely wrong for this kind of development, the Stanks roundabout on the A46 is already incredibly busy at peak times and cannot handle the significant extra traffic that this site would generate. Along with this, this land is green belt and would be a massive environmental disaster if it were concreted over.