BASE HEADER
No
Preferred Options 2025
ID sylw: 96060
Derbyniwyd: 04/03/2025
Ymatebydd: Mr Andrew Chilton
Crynodeb o'r Gynrychiolaeth:
Further SG19 development would obliterate Tiddington's separate identity as it would be swallowed up by Stratford with the strategic gap between the two being lost forever. It is imperative to avoid coalescence something that has been upheld at past planning appeals for good reason. Another river crossing between Alveston and Tiddington would destroy both villages, be incredibly expensive to build and vehicles crossing the river would face the bottle necked village centre and a congested Tiddington Road backing up from Clopton Bridge. This area frequently floods so the increased risk of surface water increases the risk flooding devastation.