BASE HEADER

Other

Preferred Options 2025

ID sylw: 96535

Derbyniwyd: 05/03/2025

Ymatebydd: Shipston Town Council

Crynodeb o'r Gynrychiolaeth:

An analysis of the HELAA B results is embedded in the attached document. It indicates the unacceptability of the Call for Sites areas both across the river in adjacent Parishes to Shipston on Stour and some within the Town itself. However, it does indicate that, with required improvement in infrastructure delivered before further development an addition of 667 dwellings (HELLA B figure) may be feasible in the SWLP period. No attempt has been made to include any windfall figures. Dunsmore & Feldon (area 96) has not been included in B.5.4.1 (Appendix B)