BASE HEADER

Other

Preferred Options 2025

ID sylw: 96552

Derbyniwyd: 05/03/2025

Ymatebydd: Shipston Town Council

Crynodeb o'r Gynrychiolaeth:

There are a number of recent SuDs installations which have been designed to be off-line and should only start to fill once a maximum flow in the site’s surface water network exceeds a threshold. Even in high rainfall periods these SuDs installations have not filled. Apart from the need to check that they have been built correctly consideration should be given to making all SuDs installations on-line.