BASE HEADER

No

Preferred Options 2025

ID sylw: 96734

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Malcolm Hayes

Crynodeb o'r Gynrychiolaeth:

Such a large development will put a lot of traffic on to the A4177 which is already busy at peak periods and becomes every time there is problem with the A46 or M40.
The existing railway station is very small and has a limited service to either Birmingham or London. It would not be able to cope with the inevitable.
The aim of the settlement appears to be to provide employment locally but it is more likely that people living in this settlement will have jobs in London, Coventry or Birmingham.
The local school cannot cope with more pupils.