BASE HEADER
No
Preferred Options 2025
ID sylw: 96780
Derbyniwyd: 05/03/2025
Ymatebydd: Mrs Penny Jordan
Crynodeb o'r Gynrychiolaeth:
Proposed planning at Little Hallend is ludicrous; we are on a single track , no through lane with very limited passing places at best. The one way access cannot sustain volumes of traffic other than the few homes here. Not only would further housing have a massive impact on the residents and general enviroment but construction traffic that would be required for building on any scale would find the access impossible, not to mention the low bridge which would be mainly impassable. Neither do we have mains drains here. The safety risks to all are extremely high.