BASE HEADER

Other

Preferred Options 2025

ID sylw: 96902

Derbyniwyd: 05/03/2025

Ymatebydd: Mrs Margaret Jeffery

Crynodeb o'r Gynrychiolaeth:

The canal tow path being used as a cycle track in the BW settlement is a recipe for disaster. To widen the tow path would mean The removal of hedges which provide shelter and food for birds. The path would have to be bonded and lighting would have to be installed. From a safety point of view railings should be built but this would impinge on accessibility for boaters mooring. Safe access to the canal and its tow path make a significant contribution to the physical and mental health and well being of the residents of Wilmcote.