BASE HEADER
No
Preferred Options 2025
ID sylw: 97582
Derbyniwyd: 05/03/2025
Ymatebydd: David Gemmell
Crynodeb o'r Gynrychiolaeth:
The proposal would equate to doubling the existing number of houses and would irrevocably change the entire market town.
Existing infrastructure would not be able to cope:
1. Healthcare (GP)
2. Road ( one main town road servicing all traffic that struggles with current traffic volume ). There are significant queues in the morning.
3. Flooding/drainage - the existing drains cannot cope and Henley floods. Flooding risk increased.
4. Education/schools - insufficient places to cope with proposed increase
There is no proposal to address any of the issues above. Specifically, the town cannot cope with increased traffic through the centre.