BASE HEADER
Other
Preferred Options 2025
ID sylw: 98472
Derbyniwyd: 06/03/2025
Ymatebydd: Philip Sykes
Crynodeb o'r Gynrychiolaeth:
The IDP cannot be trusted. It appears to be out of date. For example, the Portabello Crossroads is listed as a future project (4.8 in the South Warwickshire LOCAL PLAN Part 1). This was completed some three years ago and has been fully operational for years. There is no telling what other errors are embedded in this document.