BASE HEADER
No
Preferred Options 2025
ID sylw: 99065
Derbyniwyd: 06/03/2025
Ymatebydd: MPTL
Asiant : Harris Lamb
Crynodeb o'r Gynrychiolaeth:
No, one of the key issues underpinning renewable energy generation is the availability of a grid connection. The fact that the site is previously developed, or low quality agricultural land, will have no impact on the delivery of the scheme if there is not a viable grid connection available. The policy should recognise this.
The policy should specifically support renewable energy generation schemes provided alongside new development. For example, Call for Sites submission in respect of SG02 – Stoneleigh Park Employment Group includes a large area of renewable energy generation that can help offset the energy requirements of the development.