BASE HEADER

No

Preferred Options 2025

ID sylw: 99157

Derbyniwyd: 06/03/2025

Ymatebydd: Miss Natalie Wride

Crynodeb o'r Gynrychiolaeth:

- SG19 requires significant additional transport infrastructure south of the river for Stratford connectivity which currently there is no clear plan for.
- Coupled with extensive development from SG16 and SG15, this leads to significant increases in traffic whilst providing no additional infrastructure to support this volume of people and placing strain on existing.
- SG19 risks combining the villages of Tiddington and Alveston due to its' size. Much of the area proposed in flood plains and currently floors.
- Land east of Townsend road is a designated strategic gap by the council and cannot be built on.