BASE HEADER
No
Preferred Options 2025
ID sylw: 99167
Derbyniwyd: 06/03/2025
Ymatebydd: Miss Amanda Partridge
Shipston has already been overdeveloped relative to its infrastructure, amenities and character. The proposed development is neither strategic or sustainable for these reasons:
Transport: Shipston has no trains, infrequent buses and the existing one-way system and single track bridge are already struggling with volume.
Flooding: Proposed Fell Mill Site is unsuitable and irresponsible - it is within flood zones 2 & 3 (area regularly floods/ fields are waterlogged) and Shipston/ downstream villages would become more vulnerable.
Amenities: Lack of green space would be further eroded by these proposals.
More housing would negatively impact quality of life & character of town.