BASE HEADER

Other

Preferred Options 2025

ID sylw: 99293

Derbyniwyd: 06/03/2025

Ymatebydd: Mr John Billingham

Crynodeb o'r Gynrychiolaeth:

SG15: North of Wasperton Group
The existing road junctions to the three villages of Wasperton, Barford and Sherbourne are already very hazardous at peak times due to the very heavy volume of traffic. The traffic assessments undertaken for the Wellesbourne Innovation Campus site do not take into account this dangerous condition. Significant improvements/changes to these junctions must be made BEFORE the site is developed. This is required to satisfy Strategic Objective 3: Providing infrastructure in the right place at the right time.