BASE HEADER
Other
Preferred Options 2025
ID sylw: 99356
Derbyniwyd: 06/03/2025
Ymatebydd: Mrs Rosie Fetherston-Dilke
Crynodeb o'r Gynrychiolaeth:
The need to build is agreed but it is vital that drainage and provision of water is taken as NUMBER ONE infrastructure project. Pillerton Hersey has been badly flooded 4 times this winter and there is often a shortage of water in the summer. The antiquated sewage works at Butlers Marston was considered overburdened in 2019. Drains and flood water coming downhill from Priors to Hersey cause further flooding.
Also infrastructure eg Doctors surgeries and Schools MUST be built along with more houses.
Large number of houses in Shipston will certainly cause further flooding in wet winters.