BASE HEADER

No

Preferred Options 2025

ID sylw: 99464

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Keith Vinning

Crynodeb o'r Gynrychiolaeth:

The BW land is available but falls significantly short of the Settlement requirements. Remedy and social costs will be significant and untenable.
(i)Green belt.
(ii) Adjoins an SSSI
(iii) A wildlife passage.
(iv) Flood zones 2 and 3a.
(v) Severe local and exported surface water flood risks
(vi) High yielding greenfield agricultural site.
(vii) Adjacent conservation areas
(viii) On-time In-cost delivery unlikely.
(ix) No local employment.
(x) Transport poor, remedy prohibative
(xi) Utilities lacking remedy expensive
(xii)No renewable services.
(xiii) High topographical, historical and cultral heritage.
(xiv) Unsustainable commuting required.
(xv) N/S, E/W and local traffic mayhem without significant investment.