Gwrthwynebu

Preferred Options

ID sylw: 46325

Derbyniwyd: 03/07/2012

Ymatebydd: Mrs Lucinda Thornton

Crynodeb o'r Gynrychiolaeth:

I don't believe that the necessity for this many new houses is justified.
There also seems to be a considerable amount of development on green belt at the edge of existing towns, rather than regeneration of disused town centre sites.

Cefnogi

Preferred Options

ID sylw: 46333

Derbyniwyd: 10/07/2012

Ymatebydd: Mr Ian Clarke

Crynodeb o'r Gynrychiolaeth:

Makes sense

Gwrthwynebu

Preferred Options

ID sylw: 46387

Derbyniwyd: 06/07/2012

Ymatebydd: mr william tansey

Crynodeb o'r Gynrychiolaeth:

7.18 appears to point to an easy option of further expanding urban areas in favour of adding to rural areas in small manageable patches because it would make it "difficult to make the fullest use of public transport"

Gwrthwynebu

Preferred Options

ID sylw: 46626

Derbyniwyd: 19/07/2012

Ymatebydd: G Ralph

Crynodeb o'r Gynrychiolaeth:

The location of houses on green belt is wrong. The exceptional circumstances that are required to change the existing green belt have not been demonstrated.

Gwrthwynebu

Preferred Options

ID sylw: 46701

Derbyniwyd: 23/07/2012

Ymatebydd: Joanna Illingworth

Crynodeb o'r Gynrychiolaeth:

Brownfield sites and green field sites outside the green belt should be used in preference to green belt land, except in Kenilworth as the town is surrounded by green belt. The defunct Core Strategy planned to make more use of land in the Whitnash/Bishop's Tachbrook area for housing. If those sites were appropriate for development then, they are so now. One suspects they have been excluded from the Preferred Options because of political pressure.

Gwrthwynebu

Preferred Options

ID sylw: 46947

Derbyniwyd: 26/07/2012

Ymatebydd: Mrs Julie Tidd

Crynodeb o'r Gynrychiolaeth:

Far too much of the proposed development is on precious green belt land. There are nowhere near good enough reasons or strong enough justications given here to make this proposal acceptable. The level of growth is too high, there is no proof that its required, and it's clearly against the wishes of local people . Listen to the views of local people and preserve the precious green belt. Once its gone, its gone for ever. Its a wonderful asset and gives so much rural character to our towns. It makes Warwickshire a beautiful county.

Gwrthwynebu

Preferred Options

ID sylw: 47140

Derbyniwyd: 27/07/2012

Ymatebydd: Martin Teodorczyk

Crynodeb o'r Gynrychiolaeth:

No credence to the NPPF by prioritising brownfield land over undeveloped land or the Green Belt. This is a serious flaw and there must be a clear sequential test that prioritises brownfield land.

The plan must show flexibility and the sequential test should be ongoing throughout the 15 years.

Development has to be supported by infrastructure. Therefore I support larger developments with new roads, drainage, schools etc. on the edge of current urban areas to facilitate the use of sustainable transport methods.

Cefnogi

Preferred Options

ID sylw: 47405

Derbyniwyd: 02/08/2012

Ymatebydd: Mr Raymond Bullen

Crynodeb o'r Gynrychiolaeth:

I support phasing. Phase 1 should be brownfield only including proactive regeneration, mainly in urban locations. Phase 2 should be the same.
If the target number of houses is reduced to match the requirement that the latest data shows to be necessary then only 292 homes need to be built in greenfield areas. This should be the last phase and only happen if the population numbers show that it is necessary.

Cefnogi

Preferred Options

ID sylw: 47453

Derbyniwyd: 03/08/2012

Ymatebydd: The Europa Way Consortium and Warwickshire County Council (Physical Assets-Resources)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

The Council should confirm that the proposed phasing in the plan it is not intended act as a cap and/or a break on housing delivery, where infrastructure necessary to support the planned development is either already available or planned to be delivered in parallel with proposed new housing.

Gwrthwynebu

Preferred Options

ID sylw: 47716

Derbyniwyd: 25/07/2012

Ymatebydd: Mrs Louise Drinkhall

Crynodeb o'r Gynrychiolaeth:

Areas designated to phase 3 at that time may not be needed for development in the future so why is this area, the worst area for infrastructural needs and more importantly an area of restraint put into the first phase for building?

Gwrthwynebu

Preferred Options

ID sylw: 47945

Derbyniwyd: 03/08/2012

Ymatebydd: CPRE WARWICKSHIRE

Crynodeb o'r Gynrychiolaeth:

Number of new housing locations proposed would be harmful.
NPPF states favours protection of landscapes, fauna/flora, public footpaths and Scenic Views.
Research would identify valued landscapes.
NPPF states LPAs should take into account economic and other benefits of the best and most versatile agricultural land and seek to use areas of poorer quality land.
Use of green land will require destruction of habitats and recreational land.
Area of district not in Green Belt has generally scope for some development.
Pipelines to the south-east do not appear to be a significant constraint.
Scope for more housing at Hatton Park.

Gwrthwynebu

Preferred Options

ID sylw: 48053

Derbyniwyd: 03/08/2012

Ymatebydd: Mr David Bryan

Crynodeb o'r Gynrychiolaeth:

10% of development land to rural areas seems suspiciously arbitrary and appears to be political decision to "share the pain".
Selection of 5 "larger" villages to absorb 100 new homes is decidedly arbitrary. Selected villages do not have any special characteristics over a number of other villages or rural conurbations.
Choice of villages deemed to have infrastructure to take extra development puts extra strain on overburdened infrastructure, especially traffic.
Strain on infrastructure in existing communities could be lessened by improving infrastructure in satellite communities with CIL money generated from modest expansion there.
Review required.

Gwrthwynebu

Preferred Options

ID sylw: 48064

Derbyniwyd: 01/08/2012

Ymatebydd: Mrs Vivien Bryer

Crynodeb o'r Gynrychiolaeth:

Very special circumstances will not exist unless harm outweighed by other considerations (NPPF). Changes to green belt boundaries would result in three of five purposes of green belt not being met.
Gateway would destroy Green Belt.
Green belt study ranked green belt areas, but those at bottom not necessarily suitable for development.
No evidence to support view that dispersal would be impractical.
Impacts on historic and natural environment.
Relief road would funnel traffic onto alreadycongested roads. Buses don't get used.
Loss of agricultural land needed for food production.
Little environmental vision.
No mention of developing renewable energy.


Gwrthwynebu

Preferred Options

ID sylw: 48365

Derbyniwyd: 24/07/2012

Ymatebydd: Giles Kelsey

Crynodeb o'r Gynrychiolaeth:

Would result in erosion of rural aesthetic.
Undermines decades of successful green belt policy.
Does not have general local support within the electorate.

Gwrthwynebu

Preferred Options

ID sylw: 48383

Derbyniwyd: 24/07/2012

Ymatebydd: Mr & Mrs M Keeling

Crynodeb o'r Gynrychiolaeth:

Green belt designation is to preserve rural character, prevent merging of developed areas and stop urban sprawl.
Loss of recreation land.
Plays role in tackling climate change.
No very special circumstances.
Not shown or demonstrated how it does not harm habitat/rural aspect.
What surveys have been carried out?
Need to retain agricultural land.
Differences between this and Core Strategy?
Why previous sites not included?
Appalled at proposed link road across flood plain. Traffic will increase creating gridlock.
Park & Ride will not help.
Nothing about Stoneleigh Park.
Vacant/derelict properties, station approach car park application?

Gwrthwynebu

Preferred Options

ID sylw: 48641

Derbyniwyd: 25/07/2012

Ymatebydd: d2planning

Crynodeb o'r Gynrychiolaeth:

Given that the SHHA identifies an annual need for affordable housing of 698 dwellings which exceeds the preferred option for housing growth, this is a further indication that there is no justification to phase the release of housing sites.

Gwrthwynebu

Preferred Options

ID sylw: 48642

Derbyniwyd: 25/07/2012

Ymatebydd: d2planning

Crynodeb o'r Gynrychiolaeth:

Need further housing to meet the needs of the District and Coventry.
Green belt will need to be released to do this.
The Land at Lodge Farm (C14C) was assessed in the green belt study as being one of the least constrained parcels to the south of Coventry and potentially suitable to be released from the green belt.
The SHLAA identified the site as suitable - it is therefore available, suiatble and achievable.
The traffic modelling and schools concluded there were no problems with this site

Cefnogi

Preferred Options

ID sylw: 48830

Derbyniwyd: 03/08/2012

Ymatebydd: Warwickshire County Council - Environment & Economy Directorate

Crynodeb o'r Gynrychiolaeth:

7.5 - May wish to add within important issues reference to natural environment such as "Maintain access to the natural environment in both urban and rural settings to reap social, economic and well-being benefits".
PO4 Distribution of Sites for Housing: (A) Allocated Sites - aware of habitat evidence submitted for previous work on local plan, but suggest new model has been produced to measure Habitat Distinctiveness and Connectivity throughout Warwickshire, Coventry and Solihull. This approach is placed at heart of NPPF as way to indicate 'sensitivity' of habitats within potential allocated sites and how site acts within ecological corridors. Recommend this approach is investigated as partners to Habitat Biodiversity Audit with knowledge that habitat data is current and sound.

Gwrthwynebu

Preferred Options

ID sylw: 48863

Derbyniwyd: 18/07/2012

Ymatebydd: Home Builders Federation Ltd

Crynodeb o'r Gynrychiolaeth:

It is unclear why the Council feels it needs to phase the delivery of sites (paragraph 7.20). Surely, if all the sites have been assessed as being suitable for housing, and thus sustainable in terms of the Framework, it should be immaterial when these sites come forward for delivery.

Gwrthwynebu

Preferred Options

ID sylw: 48931

Derbyniwyd: 03/08/2012

Ymatebydd: Mary Murdoch

Crynodeb o'r Gynrychiolaeth:

Development would change the whole area for the worse.
Other issues need addressing in the district.
Repair things rather than always just build new.
The area will be spoiled if the preferred options go ahead.

Gwrthwynebu

Preferred Options

ID sylw: 49003

Derbyniwyd: 21/07/2012

Ymatebydd: Mr Alex Watkins

Crynodeb o'r Gynrychiolaeth:

Green belt should be retained to prevent urban sprawl.
The council asserts there is no where else to build new homes.
The 2009 Core Strategy identified land south of Leamington (Outside green belt) as suitable for development.
Substantial infrastructure already exists south of Leamington which could support development.
It has not been demonstrated that special circunstances exist to develop on the green belt.

Gwrthwynebu

Preferred Options

ID sylw: 49004

Derbyniwyd: 20/07/2012

Ymatebydd: Leigh Thompson

Crynodeb o'r Gynrychiolaeth:

It is disappointing that so much green belt is at risk.
According to the National planning Policy Framework the green belt protects against urban sprawl.
Exceptioanl circumstances have not been demonstrated with these plans.
There are doubts that the current infrastructure could cope with the proposed growth in its current state.

Gwrthwynebu

Preferred Options

ID sylw: 49015

Derbyniwyd: 20/07/2012

Ymatebydd: Mr Robert Butler

Crynodeb o'r Gynrychiolaeth:

The area should be protected for the future generations.
Once lost it is gone forever.
The uniqueness of place will be lost.
Retaining character is important and the character of the town which has taken time to develop should not be given up lightly.

Gwrthwynebu

Preferred Options

ID sylw: 49143

Derbyniwyd: 02/08/2012

Ymatebydd: Warwick Town Council

Crynodeb o'r Gynrychiolaeth:

Plan does not allocate development to sites which have local support or distribute development proportionally throughout District to recognise local need, thereby avoiding any single community or locality being subject to the disproportionate impact of development.

Gwrthwynebu

Preferred Options

ID sylw: 49148

Derbyniwyd: 02/08/2012

Ymatebydd: Warwick Town Council

Crynodeb o'r Gynrychiolaeth:

Recommendations place disproportionate level of development in Warwick, whilst not exploring sites elsewhere in the District.

Gwrthwynebu

Preferred Options

ID sylw: 49456

Derbyniwyd: 27/07/2012

Ymatebydd: Mr George Burn

Crynodeb o'r Gynrychiolaeth:

The current infrastructure is not sufficient to cope with more housing.
There would be more congestion on the village roads.
There would be a loss of identity for the village, there is a safety risk with all the congestion.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49485

Derbyniwyd: 18/07/2012

Ymatebydd: Mr Janak Avtar Thiara

Crynodeb o'r Gynrychiolaeth:

Development is inevitable although there have been a lot of land developed, some areas have merged together and traffic congestion has increased.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49547

Derbyniwyd: 20/06/2012

Ymatebydd: Major Bruce Prout-Richardson

Crynodeb o'r Gynrychiolaeth:

Would spoil most of the villages on the west side of Warwick.
The proposed plans will add to the current difficulties with traffic congestion.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49587

Derbyniwyd: 20/06/2012

Ymatebydd: Mr Steven Wallsgrove

Crynodeb o'r Gynrychiolaeth:

Some areas in conflict with sustainable concept. Banbury Road to Gallows Hill should be used for employment if at all.
Close to Campion Hills on top of ridge with no clear physical boundary and Loes farm where strong visual boundaries - both have restricted access.
If above sites needed for development then above The Loes and between Beverley Estate and Old Milverton lane would have least visual harm with strong visual boundaries. Shops would be supported on Woodloes Park and area between Kenilworth Road and railway at Old Milverton would be large enough to support new retail. Similarly, Sandy Lane/West Hill area.
Europa Way and back of schools on Myton Road, could be considered as a new neighbourhood to use the Leamington Retail park as third town centre, complementing town centres.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 49597

Derbyniwyd: 18/07/2012

Ymatebydd: Andrew, Julie, Eleanor, Henry Day

Crynodeb o'r Gynrychiolaeth:

Support dispersal of housing across all areas.

Atodiadau: