BASE HEADER

TABLE 7.1 Housing to be Allocated in the Plan

Yn dangos sylwadau a ffurflenni 1 i 14 o 14

Cefnogi

Preferred Options

ID sylw: 46334

Derbyniwyd: 10/07/2012

Ymatebydd: Mr Ian Clarke

Crynodeb o'r Gynrychiolaeth:

Numbers appear appropriate

Gwrthwynebu

Preferred Options

ID sylw: 47407

Derbyniwyd: 02/08/2012

Ymatebydd: Mr Raymond Bullen

Crynodeb o'r Gynrychiolaeth:

the 10,800 dwelling requrement is too high. Updating SHMA and using 2011 census data & NPPF requirements only 5,336 dwellings are necessary to meet local needs and this includes a 5% contingency. Deduct 3814 committed, windfall & small SHLA sites an 1522 remain. But 1,230 other brownfield / regeneration potential exists in urban areas that would benefit from it. This leaves 292 homes to found in villages, greenbelt and rural.

Cefnogi

Preferred Options

ID sylw: 47455

Derbyniwyd: 03/08/2012

Ymatebydd: The Europa Way Consortium and Warwickshire County Council (Physical Assets-Resources)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

The supply of housing sites appears to be overstated and therefore should be revisited and suitably adjusted.

Gwrthwynebu

Preferred Options

ID sylw: 47499

Derbyniwyd: 03/08/2012

Ymatebydd: Mr Sean Deely

Crynodeb o'r Gynrychiolaeth:

The net figure for "Balance to be Allocated in Plan" of 6986 for the number of new dwellings to be allocated is signicantly higher than it needs to be.

Gwrthwynebu

Preferred Options

ID sylw: 48081

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Graham Harrison

Crynodeb o'r Gynrychiolaeth:

I have been looking at 'windfalls' in rural areas and it seems to me the scope is much greater proportionally than it is for urban areas. For example, the conversion proposed for Haseley Manor would add a high percentage of homes to that parish.

I think therefore there is a strong case for including windfalls within the housing allocations for rural areas (especially Green Belt villages) rather than regarding them as over and above allocations. Otherwise there is a risk of creating a countryside scattered with houses.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 48651

Derbyniwyd: 26/07/2012

Ymatebydd: Mr Brian Lewis

Asiant : Stansgate Planning

Crynodeb o'r Gynrychiolaeth:

The windfall allowance is excessively high and there is little evidence that it will deliver the number of dwellings anticipated during the Plan period. The windfall allowance should be substantially reduced. This is predominantly because rates of windfall development seen during the last decade are unlikely to be repeated in the years ahead

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49036

Derbyniwyd: 27/07/2012

Ymatebydd: Quadrant Land plc

Asiant : Harris Lamb

Crynodeb o'r Gynrychiolaeth:

The Plan places too great a reliance on windfall sites (21% of the total requirement). The Council has produced windfalls in the past because too little land was allocated.
The NPPF requires LPAs to prejudice the most appropriate strategy (Para 182) and in this case we consider that land should be allocated for development in order to provide certainty for developers and infrastructure providers.
The NPPF does not endorse the use of windfalls as a means of providing housing when determining the housing requirement of a Development Plan. Given that there are opportunities to allocate sites, the most appropriate strategy i to allocate sites in the Plan.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49320

Derbyniwyd: 11/07/2012

Ymatebydd: G R Planning Consultancy Ltd

Crynodeb o'r Gynrychiolaeth:

Council consistently resists residential led scheme on former Quick's site at Station Approach. This land is not allocated in LP for housing.
None of the land has planning permission for residential and is therefore not a commitment.
Planning brief confirms B1 and residential will be supported but this is not a SPD and weight cannot be attached.
SHLAA includes land as potentially suitable urban site, but not a commitment. Confirms availability subject to bus garage relocation for 150 units.
Clients remain supportive of residential development here.
LP should promote and bring forward this site consistent with recommendation to Core Strategy.

Gwrthwynebu

Preferred Options

ID sylw: 49688

Derbyniwyd: 25/07/2012

Ymatebydd: Mrs E Brown

Asiant : Stansgate Planning

Crynodeb o'r Gynrychiolaeth:

The allowance for windfall sites of 2,300 dwellings over the plan period is excessive.

The number of homes developed on windfall sites in the early 2000's was very high but this was under different Government policy which encouraged development on previously-developed land and at minimum densities.
Whilst some allowance has been made for changes in policy, there is no justification for the allowances proposed.
Levels of windfall development over recent years have been below the levels proposed but this is partly due to the moratorium and the economic downturn. Even so, it is unlikely that windfall levels will increase to te levels proposed.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 49691

Derbyniwyd: 25/07/2012

Ymatebydd: Mrs E Brown

Asiant : Stansgate Planning

Crynodeb o'r Gynrychiolaeth:

Supports the inclusion of a flexibility allowance to ensure the full housing requirement can be met.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49939

Derbyniwyd: 02/08/2012

Ymatebydd: Barwood

Crynodeb o'r Gynrychiolaeth:

Table 7.1 - 1224 dwellings on committed housing sites - whilst clearly committed sites, we question whether it is appropriate to include all of these sites and not include any allowance for non-implementation. A 10% non-implementation rate is the industry 'norm' which we consider should be applied here, thus reducing the commitments to 1,102 dwellings.

Gwrthwynebu

Preferred Options

ID sylw: 49943

Derbyniwyd: 02/08/2012

Ymatebydd: Barwood

Crynodeb o'r Gynrychiolaeth:

We consider that the scope for new windfall development is much reduced (particularly in light of work conducted on the SHLAA) and that windfalls will no longer continue to make up a significant element of future supply. Furthermore, under the banner of the NPPF and the requirement to plan positively, windfalls should be seen as a 'bonus' rather than forming approximately 20% of the overall supply.

Gwrthwynebu

Preferred Options

ID sylw: 50134

Derbyniwyd: 03/08/2012

Ymatebydd: Mr & Mrs Peter & Linda Bromley

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

The NPPF (48) states that Local planning authorities may make an allowance for windfall sites in the five-year supply". 1,224 properties have planning permission or a planning brief at the moment and yet you do not appear to have taken these into consideration. This would equate to a two-year supply of houses. We do not believe our authority has identified and brought back into residential use the 300-400 empty houses and buildings (NPPF 51) to the extent they should have done.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50808

Derbyniwyd: 02/08/2012

Ymatebydd: Bluemark Projects

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

In the absence of any evidence from the Council, it will not be justified in terms of Paragraph 49 of the NPPF to include a windfall allowance. We therefore expect that the Council will need produce the compelling evidence required in order to justify any windfall allowance, which must only apply to sites below the threshold for the SHLAA, and exclude garden land. We therefore have concerns that the Council is currently unable to demonstrate a supply of land for 3,814 dwellings.

In addition, given that we disagree that the figure of 10,800 dwellings is an appropriate housing requirement over the Plan Period, we therefore believe that the balance of land to be allocated through the Plan is significantly in excess of the 6,986 dwellings indicated at Table 7.1.