RDS6: The Council is proposing to make provision for 22.5 hectares of new employment land

Yn dangos sylwadau a ffurflenni 61 i 64 o 64

Cefnogi

Revised Development Strategy

ID sylw: 63462

Derbyniwyd: 18/07/2013

Ymatebydd: CBRE

Crynodeb o'r Gynrychiolaeth:

We agree that the Government's NPPF provides significant weight to the need to provide for sufficient employment land during a Plan period

Gwrthwynebu

Revised Development Strategy

ID sylw: 63496

Derbyniwyd: 29/07/2013

Ymatebydd: Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

-Studies of the demand for employment land have shown that changes in types of work from industrial to more office-based professions have meant that less land is needed to provide similar numbers of jobs that before. The studies have suggested that there is little need to allocate more land for employment purposes.

-The current consultation proposals have in part been superseded by the recent decision to grant planning consent for the Coventry Gateway site. Due to the allocation of land in this location, as well as the proposed allocation at Thickthorn Kenilworth, only a very small land allocation will be needed elsewhere in the District.

Gwrthwynebu

Revised Development Strategy

ID sylw: 63497

Derbyniwyd: 29/07/2013

Ymatebydd: Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

-Table 5: There seems to be no allowance for the fact that B1 (generally office use) will often be provided by buildings of two or three stories in heights, whereas B8 warehouse use is generally single storey. The table shows B1 se provided at a rate of 3250 metres square per hectare but B8 use provided at a rate of 5000 metres square per hectare which does not appear to be correct. Clarification is needed.

Gwrthwynebu

Revised Development Strategy

ID sylw: 63498

Derbyniwyd: 29/07/2013

Ymatebydd: Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

-Calculations in Table 4: These include an extra 21.5 hectares simply to provide 'flexibility of supply'. This is significant because without the 'flexibility', it would change the employment land requirement from 22.5 hectares to just one hectare. At the very least, there needs to be more justification for this very generous 'flexibility' allowance.