BASE HEADER
Hampton Magna
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62360
Derbyniwyd: 14/01/2014
Ymatebydd: E Unitt
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62365
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Bob Turner
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62366
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Bob Turner
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62371
Derbyniwyd: 14/01/2014
Ymatebydd: T D Tipping
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62372
Derbyniwyd: 14/01/2014
Ymatebydd: T D Tipping
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62377
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Robert Sutton
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62378
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Robert Sutton
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62383
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Pamela Sutton
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62384
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Pamela Sutton
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62389
Derbyniwyd: 14/01/2014
Ymatebydd: Shelagh Suett
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62390
Derbyniwyd: 14/01/2014
Ymatebydd: Shelagh Suett
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62395
Derbyniwyd: 14/01/2014
Ymatebydd: Ms Myra Styles
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62396
Derbyniwyd: 14/01/2014
Ymatebydd: Ms Myra Styles
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62401
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Robert Cochrane
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62402
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Robert Cochrane
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62407
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Marion Smith
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62408
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Marion Smith
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62413
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs R Small
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62414
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs R Small
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62419
Derbyniwyd: 14/01/2014
Ymatebydd: L Small
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62420
Derbyniwyd: 14/01/2014
Ymatebydd: L Small
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62425
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Eimear McEntee
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62426
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Eimear McEntee
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62431
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Carol Roper
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62432
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Carol Roper
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62437
Derbyniwyd: 14/01/2014
Ymatebydd: Frank Roper
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62438
Derbyniwyd: 14/01/2014
Ymatebydd: Frank Roper
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62443
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Christine Powell
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62444
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Christine Powell
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62449
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Wayne Pearce
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.