Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62905
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Robert Davis
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62906
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Robert Davis
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62911
Derbyniwyd: 14/01/2014
Ymatebydd: Patricia Davis
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62912
Derbyniwyd: 14/01/2014
Ymatebydd: Patricia Davis
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62917
Derbyniwyd: 14/01/2014
Ymatebydd: A Bridge
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62918
Derbyniwyd: 14/01/2014
Ymatebydd: A Bridge
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62923
Derbyniwyd: 14/01/2014
Ymatebydd: Rita Boyle
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62924
Derbyniwyd: 14/01/2014
Ymatebydd: Rita Boyle
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62929
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Roy Boyle
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62930
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Roy Boyle
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62935
Derbyniwyd: 14/01/2014
Ymatebydd: Sharon Bancroft
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62936
Derbyniwyd: 14/01/2014
Ymatebydd: Sharon Bancroft
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62941
Derbyniwyd: 14/01/2014
Ymatebydd: Mr David Bancroft
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62942
Derbyniwyd: 14/01/2014
Ymatebydd: Mr David Bancroft
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62947
Derbyniwyd: 14/01/2014
Ymatebydd: M E Ayton
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62948
Derbyniwyd: 14/01/2014
Ymatebydd: M E Ayton
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62953
Derbyniwyd: 14/01/2014
Ymatebydd: G S Ayton
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62954
Derbyniwyd: 14/01/2014
Ymatebydd: G S Ayton
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62959
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Belinda Attwood
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62960
Derbyniwyd: 14/01/2014
Ymatebydd: Mrs Belinda Attwood
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62965
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Thomas Attwood
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62966
Derbyniwyd: 14/01/2014
Ymatebydd: Mr Thomas Attwood
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62971
Derbyniwyd: 14/01/2014
Ymatebydd: K Abrahall
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62972
Derbyniwyd: 14/01/2014
Ymatebydd: K Abrahall
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62977
Derbyniwyd: 14/01/2014
Ymatebydd: Mr & Mrs Tim & Gill Moore
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62978
Derbyniwyd: 14/01/2014
Ymatebydd: Mr & Mrs Tim & Gill Moore
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62983
Derbyniwyd: 14/01/2014
Ymatebydd: V Di Terlizzi
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62984
Derbyniwyd: 14/01/2014
Ymatebydd: V Di Terlizzi
Object to the proposed highway changes:
-The Exhibition (17.12.13) suggested that plans were being considered for an additional road link via Ugly Bridge Road. Object to this as it would use a country road and would act as a second cut through. A new road could 'unlock' all sites in the future. The village was never designed for this.
-Do not support a direct link with the A46. It was too dangerous when Warwick Parkway Station was built and the same applies even more now. Such link could cause gridlock and the use of a village as a cut through.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 62989
Derbyniwyd: 14/01/2014
Ymatebydd: D J Tipping
Object due to the following traffic congestion issues:
-The local school is already undergoing expansions. School run parking is already leads to traffic congestion and safety problems.
-Traffic volumes in the surrounding area have risen considerably over recent years due to Hatton Park, Warwick Chase estates, Warwick Parkway Station and Premier Inn parking.
-The Gateway Project will introduce more traffic and congestion onto the Birmingham Road and the A46, particularly lorries travelling to and from the logistics centre.
-Additional traffic would cause pollution and impact resident's health.