1) Land south of the school

Yn dangos sylwadau a ffurflenni 1 i 24 o 24

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 60657

Derbyniwyd: 05/01/2014

Ymatebydd: Mrs Helen Waite

Crynodeb o'r Gynrychiolaeth:

Believe latest communication from the council is misleading as the preferred site for potential development has now changed. Concerns remain regarding the sustainability of the village to support this proposal

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 60699

Derbyniwyd: 08/01/2014

Ymatebydd: Lynn Waters

Crynodeb o'r Gynrychiolaeth:

-Support the retaining of the distinct boundaries between the village and Warwick Gates and Whitnash.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 60747

Derbyniwyd: 12/01/2014

Ymatebydd: Lyn Thomas

Crynodeb o'r Gynrychiolaeth:

-The numbers proposed are too high.
-Holt Avenue residents were assured houses would never be built behind them because of their proximity to the M40.
-The field in question acts as a soak away during heavy rain, it collects in a huge pool at the back of the school and the ditch the farmer dug to stop water flooding homes [this helps in only a limited way].
-Many residents have retired to the village because it's not a place with lots of children.
-The village will lose its community feel.
-The school is oversubscribed.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 60801

Derbyniwyd: 14/01/2014

Ymatebydd: Mr David Taylor

Crynodeb o'r Gynrychiolaeth:

-The site is too big and it cannot therefore be regarded as sustainable in regard to the present character of the village, its facilities and infrastructure, which is only that expected of a small village.
-The site is arable farmland which is a national concern to ensure continued, sufficient availability. Such farmland helps define the village's character and developing this farmland will therefore have a detrimental impact on the landscape.
-It would place unrealistic demands on the village school, medical centre and parking.
-Access points 1 and 2 are unsuitable.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 60979

Derbyniwyd: 17/01/2014

Ymatebydd: Sport England

Crynodeb o'r Gynrychiolaeth:

There is loss of playing field and it would need to be replaced or proven to be surplus to requirements. This is the requirements of the NPPF paragraph 74.

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61047

Derbyniwyd: 19/01/2014

Ymatebydd: Mrs Jean Drew

Crynodeb o'r Gynrychiolaeth:

Although I agree this is a suitable site for development there should be fewer houses built. 75 houses (that is half the number suggested) will be more than adequate especially as a parish survey identified a need for under 20 houses. The absorption of any development into the village would be more beneficial for the community if the houses are built in phases and not all at once.

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61078

Derbyniwyd: 19/01/2014

Ymatebydd: Mr. Roy Drew

Crynodeb o'r Gynrychiolaeth:

Only partial support. Agree that development needs to be carefully phased, but why is the proposed number (150) over 10 times that (14)identified in the local housing needs study? The need can't possibly have increased that much since the study was done. A development of even 50 houses would seem far more than enough for this village. Would the school and the medical practice, not to mention the physical infrastructure, be able to cope?

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61095

Derbyniwyd: 19/01/2014

Ymatebydd: Mrs Jacqueline Crampton

Crynodeb o'r Gynrychiolaeth:

support this proposal

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61394

Derbyniwyd: 08/01/2014

Ymatebydd: Lynn Waters

Crynodeb o'r Gynrychiolaeth:

-There is accessibility questions around the preferred option as the Oakley Wood and Mallory Road are both 30mph but many vehicles exceed this. Combine this with more traffic and there will be more accidents and more difficulties entering and leaving Oakley Wood.
-There will be more noise pollution.
-Only having one additional entrance from any new development seems flawed and will congest local roads.
-More information is needed about the quantity of housing and the projected projected needs deemed required by WDC.
-Local amenities are insufficient.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61514

Derbyniwyd: 14/01/2014

Ymatebydd: Mr and Mrs Roy & Maria Hirons

Crynodeb o'r Gynrychiolaeth:

-The village does not need any housing development growth for the size of its population.
-It would spoil the beauty of the landscape. Need to protect our rural way of life from becoming an urban sprawl.
-Must stop building on agricultural farmland.
-Extra volume of traffic would cause further delays getting into Leamington and Warwick.
-Extra impact on services (i.e. the water pressure is low).
-The noise from the M40 would be unbearable for any residents of a development there.
-School has a wildlife area which is beneficial to the children's education which would be destroyed.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61524

Derbyniwyd: 15/01/2014

Ymatebydd: Mr J. Wilson

Crynodeb o'r Gynrychiolaeth:

-150 houses are not required according to the village survey.
-Access to development off Oakley Wood Road would be very dangerous given this road is very busy already.
-The site has a problem with surface water flooding.
-Should 150 houses be built the local roads would be more congested during peak time.
-The local school is already at capacity.
-The site is remote for new houses regarding local shops, bus route, church, pub and general amenities.
-Good prime farmland would be lost.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61527

Derbyniwyd: 15/01/2014

Ymatebydd: Mrs Shirley T Cotterill

Crynodeb o'r Gynrychiolaeth:

-The village cannot cope with anymore houses. Both Oakley Wood Road and Mallory Road are very busy, both are used by people going to M40, Banbury Road and Gaydon.
-The school and school in Whitnash are full.
-There is not anywhere to park for people using the church for services.
-Access onto Oakley Wood Road will not stop people driving through the village.
-Oakley Wood Road, Mallory Road and the gardens in Holt Avenue flood very often.
-How will sewage works on Oakley Wood Road cope with more houses as building site at Woodside Farm Barbury Lane also?

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61544

Derbyniwyd: 20/01/2014

Ymatebydd: Mr Malcolm Glenn

Asiant : KPG Design Associates Ltd

Crynodeb o'r Gynrychiolaeth:

-The proposed 150 dwellings are in excess of the settlement's current/projected requirement
-The provision of 150 dwellings on one site and the associated infrastructure will negatively impact the rural character of the village.
-Such a large development on the edge of the village would create an isolated community.
-Current infrastructure cannot support such a development. Developers often provide infrastructure that has extra capacity, leading to the risk that further development could be passible.
-The planned new road system for access to the school and associated facilities would enable Site 3 and potentially Site 4 to be prospects for future development.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61642

Derbyniwyd: 16/01/2014

Ymatebydd: Mrs J W Locke

Crynodeb o'r Gynrychiolaeth:

Object mainly due to Environmental, Landscape and Habitat issues.
-The noise from the M40 is atrocious, it would be far worse for people living any closer than Holt Avenue.
-The site has skylarks nesting in summer and may other birds feeding.
-The volume of traffic on Oakley Wood Road will add to an already busy road and cause problems joining the B100, another busy road at peak times.
-Land slopes towards Holt Avenue dwellings and I am concerned about flooding of these properties.

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61659

Derbyniwyd: 15/01/2014

Ymatebydd: Mrs Margaret Hayles

Crynodeb o'r Gynrychiolaeth:

-The site is close to the village centre.
-The site could have the benefit of providing a new access to the school if a road from Oakley Wood Road to the school site was safe for pedestrians and wide enough for school tariff as at present the only access is from Kingsley Road which his narrow and congested.

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61693

Derbyniwyd: 20/01/2014

Ymatebydd: Mr Mervyn Fletcher

Crynodeb o'r Gynrychiolaeth:

-Access to the school via Oakley Wood Road will relieve greatly the congestion of traffic in Kingsley Road and allow coaches to better access the school.
-The site will allow for village facilities to be accessible and for older inhabitants - not such a steep incline when walking back from the shop/church, not like the land at Tachbrook Hill Farm which is steeper.
-Would be less intrusive on the landscape and environmental issues regarding wildlife and their habitats.
-It would ease traffic going through the village to join the M40 and A452.

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61698

Derbyniwyd: 20/01/2014

Ymatebydd: Bryan Sims

Crynodeb o'r Gynrychiolaeth:

-Could become an integral part of the village as it is near to amenities and the School.
-Development could compliment the Parish Council Plan.
-A new entrance to the school could be created, relieving the problem of vehicles negotiating the narrow roads through the village.
-The development would have less visual impact, less invasion of privacy and less M40 noise pollution than other proposed Sites.
-New traffic could use Oakley Wood Road to access the M40 and Leamington/Warwick without congesting the village and dangerous Mallory Road/ Banbury Road junction.

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61856

Derbyniwyd: 20/01/2014

Ymatebydd: Bishop's Tachbrook Parish Council

Crynodeb o'r Gynrychiolaeth:

-From a community consultation on 18/01/14 as part of its Neighbourhood Plan process, the unanimous opinion of residents was that if additional housing is required in the village then Site 1 is the best location and it should be phased and limited in total to 70 homes or thereabouts.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61860

Derbyniwyd: 20/01/2014

Ymatebydd: Bishop's Tachbrook Parish Council

Crynodeb o'r Gynrychiolaeth:

-The number of houses proposed for the site is too high and should be reduced.
-From Urban Vision's study, there is potential for some of the local plan requirement to be met on the three sites referred to in the VHO and 10 other possible sites reducing the numbers required on Site 1.
-Part of the site should be reserved for future expansion of the school facilities.
-The majority of new housing should be on the lower slopes of the site avoiding the higher part towards the crest of the hill.
-There was no support for sites 2 or 3.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61868

Derbyniwyd: 20/01/2014

Ymatebydd: Bishop's Tachbrook Parish Council

Crynodeb o'r Gynrychiolaeth:

-Traffic on Oakley Wood Road is already a concern during peak times and according to the Transport Assessment (Phase 3) with the developments set out in the Local Plan per para 2.7 these figures are predicted to rise by 45% and 46% respectively.
-A similar study should be carried out for Mallory Road which is already heavily used by commuters to reach the M40 from Leamington, passing through the centre of the village. The junction of Mallory Road and Banbury Road (B4100) has a bad accident record.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61943

Derbyniwyd: 15/01/2014

Ymatebydd: Mrs Susan Edkins

Crynodeb o'r Gynrychiolaeth:

-Traffic created by 125 homes would be a hazard to already busy roads.
-The number of children needing school places will create overcrowding in the local primary school which is already up to capacity and no expansion available.
-Medical facilities will need to be increased.
-Shops I nthe village are limited so more traffic will be forced to use roads in Warwick which are already near capacity; likewise bus services.

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 62171

Derbyniwyd: 15/01/2014

Ymatebydd: Mr Barrie Hayles

Crynodeb o'r Gynrychiolaeth:

-The site is close to the village centre.
-The site could have the benefit of providing a new access to the school if a road from Oakley Wood Road to the school site was safe for pedestrians and wide enough for school tariff as at present the only access is from Kingsley Road which his narrow and congested.

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 62292

Derbyniwyd: 14/01/2014

Ymatebydd: Mr & Mrs J Wright

Asiant : Godfrey-Payton

Crynodeb o'r Gynrychiolaeth:

-The landowner supports the proposal for Bishop's Tachbrook.
-The landowners supports the identification of the site for future development and as the freehold owners of the property can confirm that they will work with the authority in order to bring the land forward for development.
-The landowner has entered into a formal option with Bloor Homes to ensure that the planning process is dealt with as quickly and efficiently as possible.
-As far as they are aware there are no constraints to this land being developed without delay.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63359

Derbyniwyd: 20/01/2014

Ymatebydd: Barwood Development Securities Ltd

Asiant : HOW Planning LLP

Crynodeb o'r Gynrychiolaeth:

-According to the VHO, the preferred option has been selected due to the 'potential regenerative impact on the village and potential improvements for accessing the primary school'. Not at any point in the report are the specific regenerative benefits identified and therefore there is no evidence to support the conclusion that the site would deliver benefits over other sites.