BASE HEADER
H42 - Westwood Heath
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68090
Derbyniwyd: 12/03/2016
Ymatebydd: Eric Williams
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
Transport infrastructure will not support this plan.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68091
Derbyniwyd: 15/03/2016
Ymatebydd: Mr Glen Ager
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
I believe the proposal for the local plan, H42, not to be viable as does not take account of the Natural Environment and Rural Communities Act 2006 and consideration of conservation of the area due to species on the endangered birds list of Merlin, Bullfinch, Fieldfare and Redwing which have been seen using the area repeatedly and other endangered species found such as stage beetle, woodpeckers, tawny owls, thrush and sparrow. The immediate and long term impact of the plan compounded with others and High Speed 2 will prevent species recovery.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68092
Derbyniwyd: 20/03/2016
Ymatebydd: Mr Glen Ager
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
Plan does not comply with the Air Quality Standards Regulations 2010 including 2004/107/EC and 2008/50/EC. The resultant increase in air pollutants from the development, the increased residential properties and facilities and increased road traffic will cause health hazards to the local community. This will be further compounded by other proposed developments in the area significantly worsening the living environment.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68094
Derbyniwyd: 20/03/2016
Ymatebydd: Mr Glen Ager
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
The local plan at H42 Westwood Heath Road does not take account of the increased traffic and the significant improvements required to local infrastructure in order to achieve reasonable traffic flows at peak times. The improvements to local roads required are extremely unlikely to be achievable to remove a worsening affect of immediate and long term increase in traffic as a direct result of the proposed development.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68095
Derbyniwyd: 20/03/2016
Ymatebydd: Mr Glen Ager
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
The local plan does not comply with the Water Resources Act 1991 as it will result in a worsening effect upon the water saturation level/zone of saturation within the area, increasing the flooding risk to surrounding land and existing properties and worsening water logging in the area during winter months and times of high rainfall. Addition of increased hard surfaces by the future residents of such as development will compound this.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68098
Derbyniwyd: 15/03/2016
Ymatebydd: Mr Ian Harrop
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
The local roads are not sufficient for the increase in traffic that this development will bring, nor is the car parking at Tile Hill station.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68282
Derbyniwyd: 16/04/2016
Ymatebydd: Mr Peter Key
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
I consider that the level of housing proposed, even capped at 425, is inconsistent with the current road infrastructure. Furthermore, I contest the need; planners should not simply accept current trends but should develop active policies to reduce needs to within sound limits, we should not accept unbridled population growth. Note also that development of HS2 could represent a major clash with housing development at the same time.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68395
Derbyniwyd: 22/04/2016
Ymatebydd: Cryfield Land (Kenilworth) Ltd
Asiant : Mr Niall Crabb
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
There is no material negative difference between Cryfield and Westwood Heath. Cryfield/Gibbet is not allocated as apparently the larger strategic sites would support a greater range of services. As Westwood Heath would provide only 14% more homes, why is it allocated in preference to Cryfield/Gibbet?
The Appraisal for allocating new sites is not fully objective and has not been subject to proper public debate on the pros and cons of allocated/non-allocated sites.
Cryfield/Gibbet is preferred by the Parish Council.
A full appraisal should be undertaken as part of the Examination to ensure that all possible (and suitable) sites have been properly appraised.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68644
Derbyniwyd: 12/03/2016
Ymatebydd: Mr. Ian Scott
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Issues around allocation of additional housing in Westwood Heath due to increased adverse impacts on road network in vicinity.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68656
Derbyniwyd: 20/04/2016
Ymatebydd: Cllr. David Skinner
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Development at Westwood Heath will generate additional traffic, with implications for road safety.
Loss of green spaces.
Issues around fuel pipeline.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68871
Derbyniwyd: 19/04/2016
Ymatebydd: Burton Green Parish Council
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Object to proposals: -
- proposals for 425 dwellings contradicts safeguarding of green belt
- no exceptional circumstances
- local road network / infrastructure would have to cope with additional traffic and evidence suggests it is at or near capacity at present
- need details of additional road infrastructure and public transport provision / improvements
- road safety issues for residents and pedestrians
- would welcome additional facilities associated with new development e.g. healthcare but schools and other facilities would be unable to cope with additional demand
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68893
Derbyniwyd: 15/04/2016
Ymatebydd: mr Charles McDonald
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
Object to proposals: -
- lack of suitable infrastructure will be exacerbated by additional traffic
- Coventry Local Plan proposing additional housing in area
- significant congestion already occurs
- HS2 works will last for a number of years and will generate large numbers of HGV movements
- overall infrastructure provision for both Coventry and Warwick should be planned and co-ordinated
- any housing development should not commence until after HS2 has finished construction in 2026
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68908
Derbyniwyd: 17/04/2016
Ymatebydd: Mr. David Hall
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
No consultation with local residents
Site selection process flawed - evidence not up to date or comprehensive (green belt, landscape, historic environment, habitat and transport)
Transport work didn't take into account adjacent development in Coventry and at Burton Green and is unsound
Proximity of university
Parking at Tile Hill insufficient
IDP does not address implications of housing - makes no reference to Westwood Heath
Inadequate provision for education
SA doesn't use updated information to screen site or commuting patterns to and from city, nor does it justify urban extensions such as Westwood Heath
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69006
Derbyniwyd: 21/04/2016
Ymatebydd: Jill Poole
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Object to allocation: -
- rushed response to inspector's comments
- lack of justification for allocation
- no proper evaluation of consequences of building houses
- loss of farmland
- lack of public transport; lack of parking for Tile Hill station
- poor accessibility
- lack of consideration of consequences for local road network
- adverse impact on existing congestion
- lack of capacity in existing infrastructure
- lack of joined-up thinking
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69387
Derbyniwyd: 13/04/2016
Ymatebydd: Mr. Graham Williams
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Westwood Lodge , Westwood Heath Road Coventry (CV4 8AA) should be included in the allocation proposed at that location. To do this the property in question should be deleted from the Green Belt.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69865
Derbyniwyd: 06/04/2016
Ymatebydd: Mrs. Sue Leatherdale
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
-Current infrastructure will not support extra housing.
-Work on HS2 will have commenced and heavy traffic will be adjacent to the proposed housing site along Bockendon Road and Westwood Heath road.
-Businesses are struggling on Westwood Business Park. Employers are struggling to recruit new staff now, due to access issues locally.
-Construction of the proposed link road would alleviate these problems and is needed before the housing is put in.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69992
Derbyniwyd: 21/04/2016
Ymatebydd: Historic England
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
The Local Plan Site Allocations Historic Environment Assessment Statement 2015 confirms that the proposed allocation site at Westwood Heath would have a "moderate adverse impact" on the setting of non-designated medieval remains and the overall archaeological potential of the site. Consequently Historic England recommends that the Statement's suggested mitigation is referred to within the Local Plan - perhaps an abbreviated version of the below .
- a staged programme of investigation and mitigation, including pre determination field evaluation to establish the presence, extent and significance of any unrecorded archaeological remains within the proposed allocation site boundary. The results should influence the design and layout of any development proposals including contributing to the sites green infrastructure provision.
Cefnogi
Proposed Modifications January 2016
ID sylw: 70066
Derbyniwyd: 22/04/2016
Ymatebydd: Stagecoach
Stagecoach supports the proposed modification allocating this site
The principle of bringing this land forward to meet Coventry's unmet OAN looks broadly sound to Stagecoach,
Support release of the land from the Green Belt
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70261
Derbyniwyd: 20/03/2016
Ymatebydd: Prof. Ian Stewart
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
-Inadequate infrastructure for proposed number of homes.
-Roads unable to cope with construction traffic.
-Coventry will have to provide all the infrastructure.
-Building on green belt is wrong.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70269
Derbyniwyd: 12/04/2016
Ymatebydd: Mr. Douglas Squires
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Plot of land at the Moat, Bockendon Road as shown on the submitted plan attached should be removed from the Green Belt, and included within the H42 Westwood Heath proposed housing allocation.