BASE HEADER

3.0 Cubbington Neighbourhood Area

Yn dangos sylwadau a ffurflenni 1 i 2 o 2

Sylw

Cubbington Neighbourhood Development Plan - Regulation 16 Submission

ID sylw: 87763

Derbyniwyd: 09/12/2024

Ymatebydd: Warwickshire County Council

Crynodeb o'r Gynrychiolaeth:

QV S3.1 - You could add to your objective a specific point about new developments needing to consider their flood risk and sustainable drainage systems when building on Greenfield and brownfield sites

Atodiadau:

Sylw

Cubbington Neighbourhood Development Plan - Regulation 16 Submission

ID sylw: 87850

Derbyniwyd: 12/12/2024

Ymatebydd: George Percy

Crynodeb o'r Gynrychiolaeth:

3.0 Cubbington Neighbourhood Area

Comment re: Figure 4. – The aerial photograph used in Figure 4 of the submission plan is out
of date and does not show the impact of the construction of the High Speed Two (HS2) railway
line to the east of the Neighbourhood Plan Area. The new railway cuts through a significant
proportion of the Neighbourhood Plan Area including ‘South Cubbington Wood’ and farmland
to the east of Cubbington. This is a key feature in the landscape of ‘the area today’ and should
therefore be visible within the photograph used in Figure 4 in order to provide context.

Comment re: History and Development of Cubbington – the context of the development of
the HS2 line to the east of the Neighbourhood Plan Area is not included within this section.
This development has had a significant impact of the village and is referred to in later sections
of the plan. Context should be provided here in respect of this development which has had a
significant impact on the landscape to the east of Cubbington; cutting through ‘South
Cubbington Wood’ and the farmland to the east of Cubbington and permanently redirecting
public rights of way.

Atodiadau: