Potential Settlement Question F1

Yn dangos sylwadau a ffurflenni 61 i 90 o 122

No

Preferred Options 2025

ID sylw: 99587

Derbyniwyd: 06/03/2025

Ymatebydd: Stratford upon Avon District Council

Crynodeb o'r Gynrychiolaeth:

My reasons are primarily that it is not in conformance with Strategic Objectives of the SWLP, with which I broadly agree. I reference those specific objectives. Furthermore, this area of land is scheduled to have a large solar farm built on it - Middle Road Solar Farm.

No

Preferred Options 2025

ID sylw: 99681

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Wesley Payne

Crynodeb o'r Gynrychiolaeth:

I don't feel that area F1 is suitable because of the following reasons: Inadequate roads already and lack of public transport links. There is nowhere local to shop . The land is hilly and beautiful, making building difficult and an eyesore. There is also the issue of where will these people work? There are no shops or employment nearer than Southam or Leamington and there is already enough traffic to these places as it is. Proximity to landfill will make these homes less desirable also. There must be other more suitable brownfield land for redevelopment. Also water drainage

Yes

Preferred Options 2025

ID sylw: 99703

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Peter Delve

Crynodeb o'r Gynrychiolaeth:

Under the National planning policy framework (NPPF) 2024 (see paragraph 144) it states development on green belt is only permitted where exceptional circumstances are fully evidenced are justified. On the basis that 46,500 homes are available via 7 of the proposed new settlement sites (E1, F1, F2, F3, G1, X1 and X2) which aren’t on green belt land. Therefore these should take preference to all other new settlement locations.

No

Preferred Options 2025

ID sylw: 99709

Derbyniwyd: 06/03/2025

Ymatebydd: Anna Kuchko

Crynodeb o'r Gynrychiolaeth:

Infrastructure is lacking in the area and would require years of development to bring it to the level suitable to accommodate the amount of people that would populate the area of this site is chosen. This would bring the area into a state of disaster for years.

Yes

Preferred Options 2025

ID sylw: 99898

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Simone Delve

Crynodeb o'r Gynrychiolaeth:

Under the National planning policy framework (NPPF) 2024 (see paragraph 144) states development on green belt is only permitted where exceptional circumstances are fully evidenced are justified. On the basis that 46,500 homes are available via 7 of the other proposed new settlement sites (E1, F1, F2, F3, G1, X1 and X2) that are not in greenbelt these should be prioritised and supported above all other proposed settlements.

No

Preferred Options 2025

ID sylw: 99997

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Geoff Cooper

Crynodeb o'r Gynrychiolaeth:

Housing covering productive fields to be occupied by commuters into local towns seeking employment.

Yes

Preferred Options 2025

ID sylw: 100115

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Lorraine Grocott

Crynodeb o'r Gynrychiolaeth:

NA

No

Preferred Options 2025

ID sylw: 100194

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Lorraine Grocott

Crynodeb o'r Gynrychiolaeth:

NA

Yes

Preferred Options 2025

ID sylw: 100769

Derbyniwyd: 07/03/2025

Ymatebydd: Mr Doug Wallace

Crynodeb o'r Gynrychiolaeth:

N/A

No

Preferred Options 2025

ID sylw: 100879

Derbyniwyd: 07/03/2025

Ymatebydd: Mr Simon Collyer

Crynodeb o'r Gynrychiolaeth:

Road transport/ connectivity in this area, and public transport links are not good enough in this area.

Yes

Preferred Options 2025

ID sylw: 101047

Derbyniwyd: 07/03/2025

Ymatebydd: Miss Melissa Gillone

Crynodeb o'r Gynrychiolaeth:

This site is significantly better than the BW site, as it lacks heritage constraints and does not contribute to the same level of urban sprawl.

No

Preferred Options 2025

ID sylw: 101066

Derbyniwyd: 07/03/2025

Ymatebydd: Adrian Summers on behalf of the Summers Family

Asiant : The Tyler Parkes Partnership Ltd

Crynodeb o'r Gynrychiolaeth:

No call for sites submission. Why is it included?

No

Preferred Options 2025

ID sylw: 101273

Derbyniwyd: 07/03/2025

Ymatebydd: Mrs Pauline James

Crynodeb o'r Gynrychiolaeth:

This development would be between Ufton and Whitnash and represents an urban sprawl and a waste of land resources. The fields are productive arable land that should not be wasted. F1, F2 and F3 would overload the lanes with traffic - and to redevelop them would lose the biodiverse trees, hedges and verges.

SG 10 and SG 9 would provide enough land to provide housing if built at 160 dwellings per hectare. This could achieve 8000 dwellings in 50 hectares including roads and open spaces. This suits 20-40 year olds in their early career.

No

Preferred Options 2025

ID sylw: 101537

Derbyniwyd: 07/03/2025

Ymatebydd: Mrs Ginny White

Crynodeb o'r Gynrychiolaeth:

The proposed development would have a detrimental impact on local wildlife and reduce access to nature for people living in urban areas. Please consider widlife sites at Long Itchington and Ufton Woods SSSI.

No

Preferred Options 2025

ID sylw: 101737

Derbyniwyd: 07/03/2025

Ymatebydd: Mrs MIchele Gill

Crynodeb o'r Gynrychiolaeth:

That area has already had large scale development with minimal increase in infrastructure to support it. It needs no more.

No

Preferred Options 2025

ID sylw: 101740

Derbyniwyd: 07/03/2025

Ymatebydd: Mrs MIchele Gill

Crynodeb o'r Gynrychiolaeth:

That area has already had large scale development with minimal increase in infrastructure to support it. It needs no more.

No

Preferred Options 2025

ID sylw: 101791

Derbyniwyd: 07/03/2025

Ymatebydd: Grevayne Properties Limited

Asiant : The Tyler Parkes Partnership Ltd

Crynodeb o'r Gynrychiolaeth:

No call for sites submissions. Why is it included?

No

Preferred Options 2025

ID sylw: 102246

Derbyniwyd: 07/03/2025

Ymatebydd: Mr Niall Shimmin

Crynodeb o'r Gynrychiolaeth:

Will overload existing infrastructure.

No

Preferred Options 2025

ID sylw: 102699

Derbyniwyd: 07/03/2025

Ymatebydd: Ms Judy Steele

Crynodeb o'r Gynrychiolaeth:

site is in open countryside in a valued Warwickshire landscape. Access to Leamington would produce severe traffic congestion especially in Radford Semele

No

Preferred Options 2025

ID sylw: 102712

Derbyniwyd: 07/03/2025

Ymatebydd: Ms Judy Steele

Crynodeb o'r Gynrychiolaeth:

Development would cause severe traffic congestion in Radford Semele and Leamington and would impinge on open countryside - we little enough left as it is

No

Preferred Options 2025

ID sylw: 102760

Derbyniwyd: 07/03/2025

Ymatebydd: Summers Holdings Ltd

Asiant : The Tyler Parkes Partnership Ltd

Crynodeb o'r Gynrychiolaeth:

It does not contain any Call for Sites submissions - why is it included?

Yes

Preferred Options 2025

ID sylw: 102835

Derbyniwyd: 07/03/2025

Ymatebydd: Mr Jem Brown

Crynodeb o'r Gynrychiolaeth:

I agree this site is less suitable. Although it has fewer distinctive habitats than F2, F3 and G3 it is a large rural (agricultural) area below an escarpment (so would be highly visible). It has some infrastructure A425 and B4455 (Fosse Way) but it is within 0.5km of Harbury Cutting SSSI and cuts into the “Land adjacent to SSSI” potential Local Wildlife Site.

Other

Preferred Options 2025

ID sylw: 103030

Derbyniwyd: 07/03/2025

Ymatebydd: Severn Trent Water

Crynodeb o'r Gynrychiolaeth:

This development site will likely require treatment at Itchen Bank (STW) Treatment Works, this Wastewater Treatment works has medium capacity and very high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium/high risk location, there is some capacity however in order to accommodate growth, infrastructure upgrades will be required and we would need to work closely to understand build timelines, in order to plan accordingly.

No

Preferred Options 2025

ID sylw: 103238

Derbyniwyd: 07/03/2025

Ymatebydd: Summers Family

Asiant : The Tyler Parkes Partnership Ltd

Crynodeb o'r Gynrychiolaeth:

It does not contain any Call for Sites submissions - why is it included?

No

Preferred Options 2025

ID sylw: 103435

Derbyniwyd: 07/03/2025

Ymatebydd: Chesterton and Kingston Parish Meeting

Crynodeb o'r Gynrychiolaeth:

This site along the Fosse Way is not a suitable site for development. There is no railway station in the immediate area. The Fosse Way is a single carriageway road in an archaeological sensitive area. The land is prone to flooding and is low lying. The land is currently a mixture of agricultural, solar power provision and intensive herbiculture. It is not suitable for housing development

No

Preferred Options 2025

ID sylw: 103743

Derbyniwyd: 07/03/2025

Ymatebydd: Mrs Deborah Carter

Crynodeb o'r Gynrychiolaeth:

By prioritising sustainable, non-Green Belt sites, housing can be delivered responsibly—without destroying the countryside, harming biodiversity, or overwhelming local services.

No

Preferred Options 2025

ID sylw: 104288

Derbyniwyd: 07/03/2025

Ymatebydd: Campaign to Protect Rural England - Warwickshire

Crynodeb o'r Gynrychiolaeth:

F1 Land west of Ufton: This is a rural landscape east of the Fosse Way, a bowl of open countryside in which any major development would be prominent, notably from Ufton. It would not be sustainable development, being dependent on car use. Traffic to/from Leamington Spa would create congestion and dangers to road safey in Radford Semele. To the east, Ufton would be congested with additional traffic., Loss of farmland (366 ha) would be serious. F1 should not be pursued.

Yes

Preferred Options 2025

ID sylw: 104621

Derbyniwyd: 07/03/2025

Ymatebydd: Ms Amy Bambridge

Crynodeb o'r Gynrychiolaeth:

It makes sense to develop around Leamington, which affords easier transport access to shops, recreation and hospitals. Leamington town centre is also in desperate need of economic rejuvenation.

No

Preferred Options 2025

ID sylw: 104875

Derbyniwyd: 07/03/2025

Ymatebydd: Barbara Looney

Crynodeb o'r Gynrychiolaeth:

Recently planning permission given for large solar farm on same site - how ridiculous! How could SDC not know. This land rises steeply including an escarpment of nearly 200ft which could not be built on. Education provision would be difficult to impossible in the area before new schools could be built. Access to the site only possible from the Fosse Way and Ufton HIll. Both are very busy and dangerous and could not accommodate a significant increase in traffic.

No

Preferred Options 2025

ID sylw: 105020

Derbyniwyd: 07/03/2025

Ymatebydd: Mrs Julia Dimambro

Crynodeb o'r Gynrychiolaeth:

Already too much traffic along the A425 and Fosse Way