Revised Development Strategy

2 The Local Plan and Consultation Process

ID sylw: 55331

Derbyniwyd: 29/07/2013

Ymatebydd: The Warwick Society

Crynodeb o'r Gynrychiolaeth:

The present proposals are unacceptable to many residents of Warwick and its neighbourhood as well as to the Warwick Society. Response is to be read alongside the Society's letter of 27 July 2012 commenting on the Preferred Options. Preferred options focus heavily on growth and new development, disregarding the negative effects of excessive growth and development on the matters that residents consider important. RDS would do even greater damage to Warwick and its neighbourhood. 97.5% of respondents objected to development of the land south of Warwick. Council has increased substantially the number of houses proposed for that area. The disregard of the views of residents and other interested parties is cause for objection to the RDS.

Many accompanying documents and all have been issued simultaneously, giving residents and other interested parties only six weeks during the summer holiday period to understand, discuss and respond to material which has taken well over a year for many council staff and consultants to produce.

The Warwick Society offers its assistance to the Council in the necessary task of devising a better alternative, with the full involvement of a wide range of residents and business interests.

Gwrthwynebu

Revised Development Strategy

RDS1: The Council is adopting an Interim Level of Growth of 12,300 homes between 2011 and 2029

ID sylw: 56826

Derbyniwyd: 29/07/2013

Ymatebydd: The Warwick Society

Crynodeb o'r Gynrychiolaeth:

The criticism of the methodology and the outcome of the housing need projections made in our objection to the Preferred Options (paras 2.1 to 2.6) stands.

The proposed figure of 12,300 new homes to be built is much too high. It must also be dependent on co-operation with Stratford District Council over its proposal for a new settlement at Gaydon. States that half of those new houses would meet local needs and half would be for incomers. Under 6,000 new homes will be sufficient to meet local needs, and forecasting to 2029 is clearly very uncertain. RDS projections can only have one certainty - that they will be wrong. In allocating greenfield land for development now, the damage of error will be immediate.

Approach is akin to having no plan at all, allowing uncontrolled growth, leaving developers to decide what to build when, with our towns, villages and countryside blighted by the effects of false certainty and a NPPF which seeks development at all costs.

NPPF requires 'sustainable development' which meets an 'established housing need' to be approved, planning applications already made or imminent for much of the land south of Warwick meet neither of these criteria.

A realistic forecast of housing need is that the District already has the required five-year +5% supply of sites. Using the exaggerated and uncertain RDS projections in support of short-term, expedient planning applications - which could over-ride the Plan process before it reaches Examination in Public - would open the Council to legal challenge.

While in theory development would be conditional on it funding schools, and healthcare facilities, strong concerns remain that the funding and provision would be inadequate, and that there would be risks to water supply, sewage and drainage.

Gwrthwynebu

Revised Development Strategy

RDS3: The Council's Preferred Option for the broad location of development is to:

ID sylw: 56827

Derbyniwyd: 29/07/2013

Ymatebydd: The Warwick Society

Crynodeb o'r Gynrychiolaeth:

Many options exist but have not been given proper consideration in the preparation of the RDS. Lower housing numbers which meet local needs, especially for affordable housing, instead of encouraging in-migration; the gradual release of land for development as demand grows; giving absolute priority to using brownfield and infill sites; building homes close to jobs and not mainly within 20% of Warwick District.

Absolute priority should be given to brownfield sites, with greenfield sites only being allocated when there is a proven immediate need. This will ensure that more brownfield sites become available, their value increased by the non-availability of easy, profitable alternatives for the mass housebuilders.

While a year ago the IBM/Opus 40 site on the north-west edge of Warwick was to be used for office development, it is now likely to be proposed for housing. It provides a good example of the way in which long-term plans are by their nature crude, and that housing sites can be found on brownfield sites well-connected to the transport network.

The agricultural land between Warwick, Whitnash and Bishop's Tachbrook is an 'Area of Restraint', designated at the time of the construction of the Warwick Technology Park, and intended to give permanent protection to this vital green gap. It should be designated as Green Belt, but the Council has refused to implement this.

Building on it would merge the built-up areas, turning them into a single suburban sprawl. This would conflict directly with one of the principles of the Local Plan Strategy, 'avoiding coalescence'. The green space between the built-up areas to the south is as important as the Green Belt to the north of Leamington and Warwick, and it should be safeguarded as strongly. Its development would conflict with the basic principle of sustainability.

The already illegally dangerous pollution in streets in centres of Warwick and Leamington would be made worse by the increase in traffic. Noise and vibration would be constant and business and residential amenity would be damaged.

No attention has been given to the requirement to reduce the impact of traffic on Warwick town centre, and in particular to reduce the level of noxious emissions. This failure invalidates the infrastructure plan. The health of residents, as well as the town centre economy and the conservation of its historic buildings, all require air quality to be given absolute priority.

Suggested by the Council that the air quality requirement could be met after development has been approved by then considering ways in which traffic through Warwick town centre could be reduced. This approach would invalidate the Transport Strategy, as the only way to reduce the volume of traffic would be transfer to other modes or other routes, neither of which has been assessed in the Strategy.

A transport plan which meets all the objectives, including protecting the historic environment and assuring air quality, must be agreed before development is allocated.

Warwick's historic environment is vital both to the social goals of the plan, to give people a sense of place and belonging, and to the economic goals as the basis of its visitor economy. It would be directly damaged by the increase in traffic and by building wide new junctions cluttered with traffic lights and signs at beautiful places: at Bridge End, over the Castle Bridge, on Castle Hill, and at St John's.

Gwrthwynebu

Revised Development Strategy

Whole area

ID sylw: 56828

Derbyniwyd: 29/07/2013

Ymatebydd: The Warwick Society

Crynodeb o'r Gynrychiolaeth:

The agricultural land between Warwick, Whitnash and Bishop's Tachbrook is an 'Area of Restraint', designated at the time of the construction of the Warwick Technology Park, and intended to give permanent protection to this vital green gap. It should be designated as Green Belt, but the Council has refused to implement this.

Building on it would merge the built-up areas, turning them into a single suburban sprawl. This would conflict directly with one of the principles of the Local Plan Strategy, 'avoiding coalescence'. The green space between the built-up areas to the south is as important as the Green Belt to the north of Leamington and Warwick, and it should be safeguarded as strongly. Its development would conflict with the basic principle of sustainability.

Development on the land between Europa Way and the Banbury Road would extend sprawl beyond the natural existing edge of the built-up area, taking development over higher ground and visible from long distances. It would directly damage the Castle Park, Grade 1 registered landscape; and the 'junction improvements' on the Banbury Road would damage its role as part of the Castle Park planned landscape.

The historic environment would also be indirectly damaged by the effect on the economy of the town centre streets being primarily a conduit for through traffic, constantly full of fumes and noise, and with their commercial premises split from each other by queues of vehicles. The damage to the commercial success of the town would lead to a longer term indirect effect of reducing the demand for such premises, residential and commercial, and a fall in their maintenance funding. There is a real risk of the town centre hollowing out, in a miniature echo of the great American cities, becoming a poor quality zone in a car-based suburban sprawl.

Gwrthwynebu

Revised Development Strategy

5.6 District Wide Transport Mitigation Proposals

ID sylw: 56829

Derbyniwyd: 29/07/2013

Ymatebydd: The Warwick Society

Crynodeb o'r Gynrychiolaeth:

Sprawling development is inevitably car-dependent. The transport strategy is car-based, just squeezing more congested traffic on to the existing road network. Transport Strategy assumes that these developments would have the same ratio of peak hour car use to housing numbers as every other development of recent decades.

Development at relatively low density cannot effectively be served by public transport. The low concentration of the population does not provide sufficient volume for a bus service to run viably at a frequency which makes it an attractive competitor with car use.

The limited influence which the County Council has over operators of unsubsidised commercial routes make it unlikely that a bus service would survive after the first few years of developer subsidy, as has been seen at other sites including the Hatton hospital redevelopment.

Walking and cycling routes will not make a significant contribution to meeting transport needs. Distances will be too long for walking and cycling will be very unattractive as soon as cyclists reach the road network on which the use of cars has been intensified.

The putative designs of new junctions in the Transport Strategy make it clear that the design priority would be to maximise the flow of vehicles, with people on foot and cyclists diverted to circuitous routes, with secondary priority at traffic light controlled crossings.

The Transport Strategy concludes that the existing level of congestion on the urban road network in Warwick, and elsewhere, will be worse than now for longer each day. The infrastructure plan proposes spending almost all of the potential developers' funding contributions on intensifying the use of the existing road network. The schemes that it labels 'junction improvements' and 'mitigation' would be improvements only in maximising the flow of vehicles; and mitigation only in reducing the increase in congestion, while increasing not reducing the impact of traffic on town centre streets. They would both make sustainable modes less usable and damage the historic and natural environment with the intrusive impedimenta of the highway engineer.