ID sylw: 56150

Derbyniwyd: 13/08/2013

Ymatebydd: King Henry VIII Endowed Trust (Warwick)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

IDP
Concerned that the Council has limited evidence on infrastructure costs and that the infrastructure being considered at the time of PDC Schedule is based on a different development strategy/level of growth to that currently proposed.

It is important that the IDP is updated to reflect the contents of the RDS. Concerned that the Draft Charging Schedule needs to reflect a final (definitive IDP) and that the relationship between CIL and s106 needs clarification.

Testun llawn:

see attached

Atodiadau:

Gwrthwynebu

Preliminary Draft Charging Schedule

CIL Preliminary Draft Charging Schedule

ID sylw: 63306

Derbyniwyd: 13/08/2013

Ymatebydd: King Henry VIII Endowed Trust (Warwick)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

Funding Gap.
Concerned that funding gap analysis has not taken place to demonstrate the need for the introduction of CIL in accordance with the regulations. This gap analysis should be undertaken and made public

Testun llawn:

see attached

Atodiadau:

Cefnogi

Preliminary Draft Charging Schedule

CIL Preliminary Draft Charging Schedule

ID sylw: 63307

Derbyniwyd: 13/08/2013

Ymatebydd: King Henry VIII Endowed Trust (Warwick)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

Welcomes the fact that the viability study is based on current market conditions and takes into account high infrastructure costs for strategic sites. The Trust is supportive of WDC's intention.

Supports a separate charging rate on strategic sites and selection of the lower element of the ranges identified. The reference to an instalment policy is welcomed.

Testun llawn:

see attached

Atodiadau:

Gwrthwynebu

Preliminary Draft Charging Schedule

CIL Preliminary Draft Charging Schedule

ID sylw: 63308

Derbyniwyd: 13/08/2013

Ymatebydd: King Henry VIII Endowed Trust (Warwick)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

Questions how realistic the 40% affordable housing assumption Does not think that 40% affordable housing will be viable on urban extension sites in the District.

Testun llawn:

see attached

Atodiadau:

Gwrthwynebu

Preliminary Draft Charging Schedule

CIL Preliminary Draft Charging Schedule

ID sylw: 63309

Derbyniwyd: 13/08/2013

Ymatebydd: King Henry VIII Endowed Trust (Warwick)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

Concerned that if housing supply levels rise then house prices could fall locally. As a consequence this will have viability implications.

The sensitivity testing (to reduced house prices by 5%) is not considered to be enough. Sensitivity testing should include a 10% and 15% reduction in prices.

Testun llawn:

see attached

Atodiadau:

Gwrthwynebu

Preliminary Draft Charging Schedule

CIL Preliminary Draft Charging Schedule

ID sylw: 63310

Derbyniwyd: 13/08/2013

Ymatebydd: King Henry VIII Endowed Trust (Warwick)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

Build cost assumptions in the PDC schedule are considered to be too low and should include an allowance for Lifetime Homes.

Testun llawn:

see attached

Atodiadau:

Gwrthwynebu

Preliminary Draft Charging Schedule

CIL Preliminary Draft Charging Schedule

ID sylw: 63311

Derbyniwyd: 13/08/2013

Ymatebydd: King Henry VIII Endowed Trust (Warwick)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

A developer return of 20% GDV has been assumed for market housing and 6% for affordable homes. 20% is considered too low in the current housing market with 25% considered reasonable.

Testun llawn:

see attached

Atodiadau:

Gwrthwynebu

Preliminary Draft Charging Schedule

CIL Preliminary Draft Charging Schedule

ID sylw: 63312

Derbyniwyd: 13/08/2013

Ymatebydd: King Henry VIII Endowed Trust (Warwick)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

Have concerns about the five sites that were considered in the viability study. Blackdown is now not in the RDS and it would have a much higher land value than sites to the South of Warwick and Leamington.

Testun llawn:

see attached