Other
Preferred Options 2025
Representation ID: 96689
Received: 05/03/2025
Respondent: Long Itchington Parish Council
There is the potential for unscrupulous promoters to use a definition of self-build for their site as it is believed that there is a greater likelihood of gaining planning permission. Once permission is obtained, we believe the developer would have no qualms in reverting to open market housing. There must be safeguards on SB sites so that, should no-one wish to buy the plot for self build, the developer cannot just sell-on the plot for open market housing.
Yes
Preferred Options 2025
Representation ID: 96717
Received: 05/03/2025
Respondent: Mrs G Wood
n/a
Other
Preferred Options 2025
Representation ID: 96722
Received: 05/03/2025
Respondent: Ms Catherine Mitchley
I agree with limited self build opportunities within settlements, but must be guaranteed that this isn't used as a loophole for developers to build small scale and swiftly sell on.
I would not agree with any building adjacent to/on the edge of settlements on greenbelt or Cotswold National landscape as this could further weaken the protection of the greenbelt and add to urban sprawl and the destruction of the natural environment.
I can't see why having plots distributed throughout a settlement would be disharmonious it could be a welcome touch of character to the uniform and unimaginative housing currently being built.
Yes
Preferred Options 2025
Representation ID: 96826
Received: 05/03/2025
Respondent: Mrs Jane Quinn
Not happy with any encroachment onto green belt land
Yes
Preferred Options 2025
Representation ID: 96850
Received: 05/03/2025
Respondent: Alcester Town Council
This is agreed by Alcester Town Council, Arrow with Weethley Parish Council, Kinwarton Parish Council, Wixford Parish Council and Great Alne Parish Council (together referred to as Alcester Parishes Group or ‘APG’).
Yes
Preferred Options 2025
Representation ID: 96929
Received: 05/03/2025
Respondent: Mrs Margaret Jeffery
N/A
No
Preferred Options 2025
Representation ID: 97130
Received: 26/02/2025
Respondent: Tysoe Parish Council
Self build is a policy that can be abused in order to circumvent planning guidelines. We would like to see this policy revised.
No
Preferred Options 2025
Representation ID: 97244
Received: 05/03/2025
Respondent: Squab Hall Farm
Agent: Mr Jack Barnes
The best way to deliver self and custom build homes to meet identified needs is to allocate specific sites designed to cater for such homes. Sites will be smaller by their nature, and therefore more responsive to market demand and more likely to be attractive to those wishing to develop their own homes. Larger sites can only efficiently be developed by the major housebuilders, and the inclusion of self and custom build within their developments can create health and safety and operational difficulties when homes in areas are being built by multiple developers to different timescales and standards.
No
Preferred Options 2025
Representation ID: 97296
Received: 05/03/2025
Respondent: Mrs June Holley
NA
Other
Preferred Options 2025
Representation ID: 97383
Received: 05/03/2025
Respondent: Godwin Developments
Godwin Developments acknowledge the requirement for custom and self-build housing plots. It is understood that both Warwick District and Stratford-on-Avon District Council have both published reports which highlight the demand and need for such sites.
The requirement of 5% on “large developments” of 100 dwellings or more is acknowledged. However, Godwin Developments would note caution if this approach is going to be apportioned to the Strategic Growth Locations. Within the specific context of Godwin Developments land interest at Aylesbury Road, whilst this site forms part of a larger SGL, it is contended that it can be developed independently for approximately 30-40 units. In this scenario, provision of custom build and self-build plots may not be suitable to this particular site.
No
Preferred Options 2025
Representation ID: 97465
Received: 05/03/2025
Respondent: Spitfire Bespoke Homes
Agent: Harris Lamb
no clear evidence of need for 5% self build on large allocated sites.
Yes
Preferred Options 2025
Representation ID: 97686
Received: 05/03/2025
Respondent: Mrs Susan Leonard
Good opportunity for individuals to be creative and make decisions on their living requirements.
Yes
Preferred Options 2025
Representation ID: 97736
Received: 05/03/2025
Respondent: Mr Gary Jeffery
N/A
No
Preferred Options 2025
Representation ID: 98092
Received: 06/03/2025
Respondent: William Davis Limited
Agent: Marrons
The best way to deliver self and custom build homes to meet identified needs is to allocate specific sites designed to cater for such homes. Sites will be smaller by their nature, and therefore more responsive to market demand and more likely to be attractive to those wishing to develop their own homes. Larger sites can only efficiently be developed by the major housebuilders, and the inclusion of self and custom build within their developments can create health and safety and operational difficulties when homes in areas are being built by multiple developers to different timescales and standards.
No
Preferred Options 2025
Representation ID: 98247
Received: 06/03/2025
Respondent: Mr Jonathan Woodward
N/a
Other
Preferred Options 2025
Representation ID: 98340
Received: 06/03/2025
Respondent: Catesby Estates
Agent: Mr Will Whitelock
We agree with the general approach for the provision custom and self-build housing plots in order help to diversify the housing market and increase consumer choice in accordance with NPPF Paragraph 63. However, a draft SWLP policy requirement for 5% of the developable area for large developments (100 or more dwellings) to be made available for the provision of self-build and custom-build homes, may lead to an over-supply of this housing tenure - far greater than the level of need identified on the Council’s Register for the past few years. Therefore, greater flexibility is required in the policy wording
Yes
Preferred Options 2025
Representation ID: 98602
Received: 06/03/2025
Respondent: Mr Christopher Bailey
No additional comments
No
Preferred Options 2025
Representation ID: 98665
Received: 06/03/2025
Respondent: X2 New Settlement Consortium
Agent: Mr Jack Barnes
The best way to deliver self and custom build homes to meet identified needs is to allocate specific sites designed to cater for such homes. Sites will be smaller by their nature, and therefore more responsive to market demand and more likely to be attractive to those wishing to develop their own homes. Larger sites can only efficiently be developed by the major housebuilders, and the inclusion of self and custom build within their developments can create health and safety and operational difficulties when homes in areas are being built by multiple developers to different timescales and standards.
No
Preferred Options 2025
Representation ID: 98715
Received: 06/03/2025
Respondent: Makestone Strategic Land - Hampton Lucy
Agent: Mr Jack Barnes
The most effective way to secure the delivery of Self and Custom Build (SCB) homes to meet identified needs is to allocate specific sites designed to cater for such homes. This will ensure a positively prepared plan which is effective and deliverable in accordance with NPPF tests of soundness 36(a) and (c). Makestone Strategic Land’s site at Hampton Lucy can provide a readily available and feasible site for the SWLP to allocate self and custom build homes, in a location which will be desirable those seeking an individual plot.
No
Preferred Options 2025
Representation ID: 98733
Received: 06/03/2025
Respondent: Makestone Strategic Land - Ashow
Agent: Mr Jack Barnes
The most effective way to secure the delivery of Self and Custom Build (SCB) homes to meet identified needs is to allocate specific sites designed to cater for such homes. This will ensure a positively prepared plan which is effective and deliverable in accordance with NPPF tests of soundness 36(a) and (c). Makestone Strategic Land’s site at Ashow can provide a readily available and feasible site for the SWLP to allocate self and custom build homes, in a location which will be desirable those seeking an individual plot.
Yes
Preferred Options 2025
Representation ID: 98934
Received: 06/03/2025
Respondent: Liberal Democrat Group (Stratford District councillors)
I agree with the approach
No
Preferred Options 2025
Representation ID: 99009
Received: 06/03/2025
Respondent: (1) AG Family Trust 2024 & (2) N. Holdsworth
Agent: The Tyler Parkes Partnership Ltd
The draft policy provision in respect of large developments (110+ dwellings) should be discretionary not a requirement since most self-builders are unlikely to want a site being built by a volume housebuilder.
Those suggested changes would be consistent with the results of earlier consultation outcomes.
Notwithstanding the above, the land east of Station Lane could be an ideal site, at least in part, for Custom and Self Building Housing. The allocation of land to the east of Station Road, Kingswood help would ensure that the Council is making adequate provision for Custom and Self Building Housing, as required.
No
Preferred Options 2025
Representation ID: 99298
Received: 06/03/2025
Respondent: Vistry Strategic Land - Wellesbourne
There is no evidence to suggest that there is this level of demand for self and custom-build plots in such large clusters or that that they will be deliverable.
Other
Preferred Options 2025
Representation ID: 99324
Received: 06/03/2025
Respondent: Summers Holdings Ltd
Agent: The Tyler Parkes Partnership Ltd
The draft policy states, "Within all large developments (100 or more dwellings):
5% of the developable area of a site is to be made available for the provision of self-build and custom-build homes."
This provision should be discretionary not a requirement since most self-builders are unlikely to want a site being built by a volume housebuilder.
Also, suggested re-word from "On suitable sites adjacent to defined settlement boundaries to meet a district-wide need." to "On suitable sites adjacent to existing settlements to meet a district-wide need.
Those suggested changes would be consistent with the results of earlier consultation outcomes.
No
Preferred Options 2025
Representation ID: 99483
Received: 06/03/2025
Respondent: Mrs Diane Wilson
Object strongly to any further development and loss of green space
Yes
Preferred Options 2025
Representation ID: 99615
Received: 06/03/2025
Respondent: Ms Gillian Padgham
agree
No
Preferred Options 2025
Representation ID: 99691
Received: 06/03/2025
Respondent: Welford on Avon Parish Council
Self build and custom developments should be just that, the 12 month marketing time limit is far too short. This should not be avilable at all, its open to abuse and has been !
Yes
Preferred Options 2025
Representation ID: 100252
Received: 06/03/2025
Respondent: Miss Ann Colley
This would provide indivdualism to a development area which potentially could be all the same and characterless.
Yes
Preferred Options 2025
Representation ID: 100296
Received: 06/03/2025
Respondent: Mrs Lorraine Grocott
NA
No
Preferred Options 2025
Representation ID: 100311
Received: 06/03/2025
Respondent: Mr Geoff Cooper
If there is a pressing housing need then speed is of the essence and often self builds take far too long. The delay in construction effectively reduces available housing therefore the proportion for self builds as part of other developments should be reduced.