Showing comments and forms 31 to 60 of 102

Yes

Preferred Options 2025

Representation ID: 93143

Received: 01/03/2025

Respondent: Dr Penny Gray

Representation Summary:

This is also important.

Yes

Preferred Options 2025

Representation ID: 93192

Received: 01/03/2025

Respondent: Mr Michael Checkley

Representation Summary:

I fully support the approach taken in Draft Policy- I

Other

Preferred Options 2025

Representation ID: 93693

Received: 02/03/2025

Respondent: Cllr David Armstrong

Representation Summary:

Severn Trent's draft Water Resources Management plan does not appear to take account of the latest housing growth figures in the SWLP. As such, please ensure that meetings are held with Severn Trent to align water supply plans with housing growth locations, and that any significant constraints on water supply development are identified before selecting sites.

No

Preferred Options 2025

Representation ID: 93877

Received: 02/03/2025

Respondent: Mr Patrick Embleton

Representation Summary:

The idea that a further 3000 house in Shipston on Stour would need a major water and sewage system upgrade and trying to minimise the amount of work involved is wrong

Yes

Preferred Options 2025

Representation ID: 93881

Received: 02/03/2025

Respondent: Mrs Beverley Comley

Representation Summary:

As the area around Wellesbourne often has messages about summer ‘peak use’ and sometimes a lack of water - I do not believe that the current infrastructure affords the proposed dense housing proposals. A much smaller development which are spread across all villages and towns is much preferred.

Yes

Preferred Options 2025

Representation ID: 93908

Received: 02/03/2025

Respondent: Mrs Beverley Comley

Representation Summary:

Road run off also needs addressing

No

Preferred Options 2025

Representation ID: 94132

Received: 02/03/2025

Respondent: Stuart Mace

Representation Summary:

The supply of water should not impact upon existing developments before prioritising new developments.

Yes

Preferred Options 2025

Representation ID: 94338

Received: 03/03/2025

Respondent: phillip claydon

Representation Summary:

All infrastructure must be in place BEFORE any new development takes place.

Yes

Preferred Options 2025

Representation ID: 95000

Received: 03/03/2025

Respondent: Kineton Parish Council

Representation Summary:

"adequate water supply” should be measured by flow and pressure?
Policy should also deal with the ownership/responsibility for SuDS maintenance which has a long term impact on residents of and management companies for small and large developments (eg 8 - 100 dwellings)
Should developers warrant that where systems are not to be connected to the statutory authority’s infrastructure it will be constructed to a standard acceptable to that authority? i.e. do not allow developers to build inferior water and sewerage pipework throughout a development which could lead to major pollution issues in the medium to long term.

Yes

Preferred Options 2025

Representation ID: 95740

Received: 04/03/2025

Respondent: Bloor Homes Western

Agent: Marrons

Representation Summary:

The requirement for development to mitigate any increase in surface water runoff with SuDS is supported, along with ensuring that there is adequate water supply resulting from any development proposals.

Other

Preferred Options 2025

Representation ID: 95873

Received: 04/03/2025

Respondent: Mr David Carter

Representation Summary:

The criteria applied to ensuring that there is adequate wastewater infrastructure to serve new developments are not robust enough. This issue should be addressed more effectively.

Other

Preferred Options 2025

Representation ID: 95943

Received: 04/03/2025

Respondent: Mr Paul Tesh

Representation Summary:

There is a disconnect within the current planning system whereby developers are only required to assess the impact of their foul and surface water discharge to their connection point to the adopted sewer network. This very often results in discharges to inadequate existing surface water and foul water system(s) resulting in flooding downstream of the development. Developers must be required, as part of the planning process to assess that the existing network that they are discharging to has sufficient capacity to accept the additional flows, both foul and surface water, between their site connection and the outfall (ie the treatment works or main river) without causing flooding to existing properties. If upgrades are required then the developer must be obligated to contribute significantly to the upgrade of the network. The proposed policy does not place sufficient obligation on the developer to protect properties downstream of his development from surface water and foul water flooding.

Other

Preferred Options 2025

Representation ID: 96198

Received: 04/03/2025

Respondent: Mr Jonathan Horsfield

Representation Summary:

NO new connections into combine sewers - not just 'avoid'

Policy needs to require evidence that existing sewers can handle extra loading

Long term monitoring of effluent in receiving waterways to show that new development will not make pollution worse

Yes

Preferred Options 2025

Representation ID: 96338

Received: 05/03/2025

Respondent: Southam Town Council

Representation Summary:

Southam Town, District and County elected representatives support this draft Policy.

Other

Preferred Options 2025

Representation ID: 96538

Received: 05/03/2025

Respondent: Shipston Town Council

Representation Summary:

overview and background required

Yes

Preferred Options 2025

Representation ID: 96726

Received: 05/03/2025

Respondent: Mrs G Wood

Representation Summary:

Current water supply is inadequate, in any event the water infrastructure requires upgrading.

Yes

Preferred Options 2025

Representation ID: 96909

Received: 05/03/2025

Respondent: Mrs Margaret Jeffery

Representation Summary:

Disposal of surface water and sewage in BW will be very expensive and difficult.

Yes

Preferred Options 2025

Representation ID: 96963

Received: 05/03/2025

Respondent: John Dinnie

Representation Summary:

The entire downstream foul water system must be assessed for adequacy before connection is allowed.
The downstream discharge rate from any surface water drainage or SUDS system must be limited to one third of the current green field runoff or one tenth of the current brownfield runoff.
Shortfalls in the current systems, including allowing for climate change, must be addressed as a minimum before considering any further development.

Yes

Preferred Options 2025

Representation ID: 96983

Received: 05/03/2025

Respondent: Alcester Town Council

Representation Summary:

This is agreed by Alcester Town Council, Arrow with Weethley Parish Council, Kinwarton Parish Council, Wixford Parish Council and Great Alne Parish Council (together referred to as Alcester Parishes Group or ‘APG’).

Yes

Preferred Options 2025

Representation ID: 97179

Received: 26/02/2025

Respondent: Tysoe Parish Council

Representation Summary:

Yes

Yes

Preferred Options 2025

Representation ID: 97254

Received: 05/03/2025

Respondent: Squab Hall Farm

Agent: Mr Jack Barnes

Representation Summary:

The requirement for development to mitigate any increase in surface water runoff with SuDS is supported, along with ensuring that there is adequate water supply resulting from any development proposals.

Other

Preferred Options 2025

Representation ID: 97388

Received: 05/03/2025

Respondent: Godwin Developments

Representation Summary:

Godwin Developments acknowledge that there should be an adequate water supply to serve existing and new developments. However, it is important that applicants are given clear and concise guidance from Lead Local Flood Authority and statutory undertakers on this matter. There is a concern on current applications regarding the time it takes to receive guidance on these matters which causes unnecessary delays to planning applications.

With respect to Land at Aylesbury Road, Godwin Developments have been engaging with Severn Trent Water and those discussions have confirmed that there is a suitable connection point for foul sewage to serve this development.

Yes

Preferred Options 2025

Representation ID: 97790

Received: 05/03/2025

Respondent: Mr Gary Jeffery

Representation Summary:

Third bullet point essential.
As BW is prone to flooding, disposal of surface water and sewerage will be costly and challenging.

Yes

Preferred Options 2025

Representation ID: 97968

Received: 05/03/2025

Respondent: Mr Simon Fox

Representation Summary:

Any surface water management needs to be complete and sufficient size to prevent downstream flooding. This needs to be included in the total environmental footprint cost in order to minimise the sustainability impacts.
Note in terms of BW - one of the potential new settlements, for the existing houses in the immediate new settlement area - like ourselves - there is no existing sewerage service and we have our own individual treatment plants. So significant waste water treatment facilities will be required.

Yes

Preferred Options 2025

Representation ID: 98105

Received: 06/03/2025

Respondent: William Davis Limited

Agent: Marrons

Representation Summary:

The requirement for development to mitigate any increase in surface water runoff with SuDS is supported, along with ensuring that there is adequate water supply resulting from any development proposals.

Yes

Preferred Options 2025

Representation ID: 98657

Received: 06/03/2025

Respondent: X2 New Settlement Consortium

Agent: Mr Jack Barnes

Representation Summary:

The requirement for development to mitigate any increase in surface water runoff with SuDS is supported, along with ensuring that there is adequate water supply resulting from any development proposals.

Yes

Preferred Options 2025

Representation ID: 98806

Received: 06/03/2025

Respondent: Philip Sykes

Representation Summary:

Agree

Yes

Preferred Options 2025

Representation ID: 98888

Received: 06/03/2025

Respondent: Mr Roger Shimmin

Representation Summary:

The provision of adequate waste water handling is critical to prevent flooding and/or overloading of the sewerage system.

Yes

Preferred Options 2025

Representation ID: 99646

Received: 06/03/2025

Respondent: Ms Gillian Padgham

Representation Summary:

agree

Other

Preferred Options 2025

Representation ID: 99868

Received: 06/03/2025

Respondent: Mr Steven Simpson

Representation Summary:

Look at Rain water harvesting and re-use.