No
Preferred Options 2025
Representation ID: 92642
Received: 28/02/2025
Respondent: Bex Thomson
Waste of time more polluting than normal vehicles
Yes
Preferred Options 2025
Representation ID: 92687
Received: 28/02/2025
Respondent: Mr Paul Fairburn
You refer to coming demand. Demand for EVs depends on the availability of charge points. Install chargers before expecting people to buy EVs. Prioritise installing more 7kW chargers over expensive superfast ones.
The draft plan says on-street charging is the responsibility of WCC. Whenever it falls to them, SDC should ensure homeowners can easily install a small channel across the pavement for their charging cables. Simplify and reduce the cost of cross-pavement charging rules wherever SDC is involved.
Other
Preferred Options 2025
Representation ID: 93490
Received: 02/03/2025
Respondent: Wellesbourne and Walton Parish Council
Whilst this is a way forward it fails to address rural needs'. This identifies car parks owned by SDC. What about villages that do not have these. What provision is made for them. Currently, on street provision has gone to urban centres but failed to be provided for rural centres where older properties do not have front gardens or garages where an EV point can be provided. A much wider provision is needed.
Yes
Preferred Options 2025
Representation ID: 93917
Received: 02/03/2025
Respondent: Mrs Beverley Comley
Where the installation of chargers on main roads where individual homes cannot charge - the width of pavement should still be sufficient- and in tiddington with its very wide pavements in areas it can be done easily
No
Preferred Options 2025
Representation ID: 93963
Received: 02/03/2025
Respondent: Mrs Carina Taylor
Make every company have charging points, until this changes, working people will not buy electric cars, the range on them is not far enough for those living in rural areas who have to commute long distances for work.
Yes
Preferred Options 2025
Representation ID: 94123
Received: 02/03/2025
Respondent: Mr David Kelly
There should also be central pressure on providers of charge points to make using them affordable - the biggest hindrance to EV take up is the cost of charging away from home.
Yes
Preferred Options 2025
Representation ID: 94885
Received: 03/03/2025
Respondent: Stratford-upon-Avon Town Transport Group
yes
Other
Preferred Options 2025
Representation ID: 94986
Received: 03/03/2025
Respondent: Stuart Mace
Rural areas already suffer from regular power cuts during the day, the additional demands placed on power grids for EV charging require particular attention in those locations where substantial development is proposed.
Yes
Preferred Options 2025
Representation ID: 95228
Received: 04/03/2025
Respondent: Kineton Parish Council
no further comment
No
Preferred Options 2025
Representation ID: 95290
Received: 04/03/2025
Respondent: Mr Chris Edgeworth
Bishops Itchington lacks any parking space for placing EV charging facilities. Most residents of the village commute to work, eg Coventry, Birmingham or Oxford. Some residents can charge at home, but to promote wider use of electric vehicle use, space will need to be found to locate EV chargers.
No
Preferred Options 2025
Representation ID: 95767
Received: 04/03/2025
Respondent: Bloor Homes Western
Agent: Marrons
It should be noted that Part S to the Building Regulations provides technical guidance regarding charge point requirements that developers are obliged to meet. This somewhat negates the need for a robust policy on EV charging infrastructure for new developments and thus the policy should make reference to the Building Regulations instead. Further, any policy should build on the Warwick District Council Net Zero DPD, adopted in May 2024, which currently provides no specific guidance for developers in relation to the provision of EV charging points or ultra-low emission vehicles.
Yes
Preferred Options 2025
Representation ID: 95777
Received: 04/03/2025
Respondent: Mrs Amanda Dyhouse
N/A
Other
Preferred Options 2025
Representation ID: 95882
Received: 04/03/2025
Respondent: Mr David Carter
In order to achieve the desired uptake of electric vehicles central and local government and the private sector need to adopt a much more integrated approach to the provision of an adequate and affordable public charging network
Yes
Preferred Options 2025
Representation ID: 95958
Received: 04/03/2025
Respondent: Mr Paul Tesh
Yes. The provision of off-street car park chargers needs to be addressed urgently to enable visitors to South Warwickshire to charge their vehicles during their visit. At present there is a considerable lack of public EV chargers in the Local Centres.
Yes
Preferred Options 2025
Representation ID: 96081
Received: 04/03/2025
Respondent: Mr nigel Freeth
no comment
Other
Preferred Options 2025
Representation ID: 96352
Received: 05/03/2025
Respondent: Southam Town Council
Southam Town, District and County representatives support in principle but should go further in removing barriers to EV adoption for residents havng no on-site parking by:
1) in new developments specifying that EV charging provision be made at designated shared parking areass and
2) for existing properties, easing planning consents for installation of safe routes from dwelling to road for charge cables (e.g. approved channels across foot paths).
Yes
Preferred Options 2025
Representation ID: 96515
Received: 05/03/2025
Respondent: Shipston Town Council
The provision of off-street car park chargers needs to be addressed urgently to enable visitors to South Warwickshire to charge their vehicles during their visit. At present there is a considerable lack of public EV chargers in the Local Centres.
Other
Preferred Options 2025
Representation ID: 96880
Received: 05/03/2025
Respondent: Mrs Margaret Jeffery
Relying on electric cars would not be feasible for the foreseeable future due to lack of popular demand, insurance and manufacturing issues and a currently inadequate National Grid.
Yes
Preferred Options 2025
Representation ID: 97057
Received: 05/03/2025
Respondent: Alcester Town Council
This approach is agreed by Alcester Town Council, Arrow with Weethley Parish Council, Kinwarton Parish Council, Wixford Parish Council and Great Alne Parish Council (together referred to as Alcester Parishes Group or ‘APG’).
Yes
Preferred Options 2025
Representation ID: 97064
Received: 05/03/2025
Respondent: Alcester Town Council
This is agreed by Alcester Town Council, Arrow with Weethley Parish Council, Kinwarton Parish Council, Wixford Parish Council and Great Alne Parish Council (together referred to as Alcester Parishes Group or ‘APG’), but any plans to increase EV charging facilities must have regard to local power network capacity and impact on residential properties.
Yes
Preferred Options 2025
Representation ID: 97075
Received: 05/03/2025
Respondent: John Dinnie
EV chargers are needed in the south end of the county. District council car parks would be good locations for these.
No
Preferred Options 2025
Representation ID: 97172
Received: 05/03/2025
Respondent: Sir Thomas White’s Charity and The King Henry VIII Endowed Trust, Warwick
Agent: Stansgate Planning
The final paragraph of Draft Policy Direction 32 indicates there will be a robust policy for the provision of EV charging infrastructure in new developments. Framework paragraph 16 f) states that Development Plans should serve a clear purpose, avoiding unnecessary duplication of policies that apply to a particular area. Electric Vehicle Charging Points, with associated infrastructure, are required under Building Regulations Approved Document S for all new dwellings and commercial developments. As such, there is no need for the duplication within planning policy and the references should be removed.
Yes
Preferred Options 2025
Representation ID: 97200
Received: 26/02/2025
Respondent: Tysoe Parish Council
Yes
No
Preferred Options 2025
Representation ID: 97275
Received: 05/03/2025
Respondent: Squab Hall Farm
Agent: Mr Jack Barnes
It should be noted that Part S to the Building Regulations provides technical guidance regarding charge point requirements that developers are obliged to meet. This somewhat negates the need for a robust policy on EV charging infrastructure for new developments and thus the policy should make reference to the Building Regulations instead. Further, any policy should build on the Warwick District Council Net Zero DPD, adopted in May 2024, which currently provides no specific guidance for developers in relation to the provision of EV charging points or ultra-low emission vehicles.
Other
Preferred Options 2025
Representation ID: 97534
Received: 05/03/2025
Respondent: Mr HUGH KEEP
Yes, but please no dual use parking spaces as in the West end of Chestnut Walk in Stratford. Either electric vehicle charging spaces or parking spaces but not either or.
Other
Preferred Options 2025
Representation ID: 97779
Received: 05/03/2025
Respondent: Mr Gary Jeffery
General reliance on electric vehicles remain very uncertain for the foreseeable future due to lack of adequate infrastructure eg. National Grid, lack of popular demand and attendant issues such as insurance.
Other
Preferred Options 2025
Representation ID: 97996
Received: 05/03/2025
Respondent: Mr Simon Fox
it is clear in 2040 - any new house should as standard have a fast charger attached - and the infrastructure assessment should consider this need in any assessment.
It is not just about car parks
No
Preferred Options 2025
Representation ID: 98123
Received: 06/03/2025
Respondent: William Davis Limited
Agent: Marrons
It should be noted that Part S to the Building Regulations provides technical guidance regarding charge point requirements that developers are obliged to meet. This somewhat negates the need for a robust policy on EV charging infrastructure for new developments and thus the policy should make reference to the Building Regulations instead. Further, any policy should build on the Warwick District Council Net Zero DPD, adopted in May 2024, which currently provides no specific guidance for developers in relation to the provision of EV charging points or ultra-low emission vehicles.
Other
Preferred Options 2025
Representation ID: 98577
Received: 06/03/2025
Respondent: Holly Farm Business Park
Agent: The Tyler Parkes Partnership Ltd
Holly Farm Business Park already provides vehicle charging facilities for the use of employees and visitors to the business park. As a business it is committed to increasing the number of charging points in line with increasing demand.
No
Preferred Options 2025
Representation ID: 98635
Received: 06/03/2025
Respondent: X2 New Settlement Consortium
Agent: Mr Jack Barnes
It should be noted that Part S to the Building Regulations provides technical guidance regarding charge point requirements that developers are obliged to meet. This somewhat negates the need for a robust policy on EV charging infrastructure for new developments and thus the policy should make reference to the Building Regulations instead. Further, any policy should build on the Warwick District Council Net Zero DPD, adopted in May 2024, which currently provides no specific guidance for developers in relation to the provision of EV charging points or ultra-low emission vehicles.