Issue and Options 2023
Search form responses
Results for Bloor Homes Midlands search
New searchYes, the HEDNA provides a reasonable basis for identifying future levels of housing need across South Warwickshire. However, Bloor Homes reserve its position in respect of whether this approach is reasonable for other authorities in Coventry and Warwickshire. The NPPF sets out that “to determine the minimum number of homes needed, strategic policies should be informed by a local housing need assessment, conducted using the Standard Method in national planning guidance – unless exceptional circumstances justify an alternative approach which also reflects current and future demographic trends and market signals” . National policy is therefore supportive of the approach that South Warwickshire Councils are seeking to implement, and as such utilising the HEDNA to inform the local housing need for South Warwickshire is supported. It is important, however, to remember that the local housing need is not the same as the housing requirement within the Plan. The UCS suggests that the SWLP housing need equates to 30,750 dwellings, however this figure does not reflect the latest evidence within the HEDNA and needs updating. In addition, the UCS assumes a Plan period which commences in 2025, however this does not align with the base date of the HEDNA and as such a Plan period from 2022 is considered more appropriate to align with the evidence base. On the basis of the above, we consider a more appropriate local housing need for the SWLP is 47,012 dwellings over a 28 year plan period. In line with the NPPF , it is considered that this figure represents the minimum number of homes needed, and that the Councils should consider whether it is appropriate to set a higher housing requirement in line with national guidance ; for example in order to address a significant affordable housing shortfall, support economic development, or address strategic infrastructure requirements which are likely to increase the number of homes needed. Further consideration will also need to be given to unmet needs within the Housing Market Area in line with the Duty to Cooperate and the positively prepared test of soundness , which is explored in further detail in response to Issue H4 below. Bringing together comments on the UCS and Unmet Needs under Q-H4.2, Bloor Homes consider that the SWLP will need to plan for a level of housing growth in the order of at least 43,000 dwellings.
It is imperative that that SWLP adequately considers accommodating unmet housing needs which are arising from outside of South Warwickshire, to ensure compliance with the Duty to Cooperate and so the SWLP can demonstrate adherence with the positively prepared test of soundness set out in the NPPF . It is recognised that national planning policy and law has the potential to change during the course of the preparation of the SWLP, including in relation to the Duty to Cooperate and replacement with an ‘alignment policy’, however there is no suggestion the requirement for local authorities to address unmet needs arising from within their Housing Market Areas will be removed. We consider that there are two likely sources of unmet housing needs which require consideration in the development of the SWLP: Birmingham and Black Country and Coventry and Warwickshire. Birmingham and Black Country There are clearly significant unmet housing needs arising from the Birmingham and Black Country Housing Market Area which require addressing by this Plan. Birmingham published a New Local Plan Issues and Options consultation document in October 2022. This identifies an overall housing need in Birmingham to 2042 (derived from the Standard Method) of some 149,286 dwellings, with total housing supply equating to just 70,871 – leaving a shortfall of some 78,415 dwellings. There are significant limitations to the potential for such substantial unmet needs to be met by Birmingham’s neighbouring authorities due to lack of available land in the Black Country and significant Green Belt coverage in the Black Country and elsewhere (Bromsgrove, Solihull, North Warwickshire, and Lichfield). This was evident in the work undertaken in the now abandoned Black Country Local Plan Review, which was subject to Regulation 18 consultation in 2021 and identified a shortfall in supply across the Black Country of some 28,239 dwellings to 2039. There are strong functional relationships between Birmingham and South Warwickshire, in terms of transport connections and commuting patterns, and development in South Warwickshire can contribute towards meeting unmet needs. The Councils clearly need to engage with Birmingham and the Black Country authorities and others to determine an appropriate level of unmet needs to be directed to South Warwickshire. That process needs to be transparent in accordance with paragraph 27 of the NPPF, and effective in accordance with paragraph 35 c) of the NPPF. The lack of any published Statement of Common Ground showing progress made so far by the Councils is a concern that needs to be addressed before the next round of consultation. The Councils need to properly grapple with this issue, and not allow the failings of the last round of Local Plans to be repeated. It is noted that the SA has tested the effects of an additional 5,000 to 10,000 dwellings to accommodate Birmingham’s unmet needs, however given the numbers discussed above Bloor Homes consider 5,000 dwellings to be at the lower end of what could be expected to be accommodated in South Warwickshire. At this stage of the process and in advance of those discussions, as a working assumption for the level of unmet need to be accommodated, the figure should be an additional 10,000 dwellings. Coventry and Warwickshire Although the question does not address Coventry’s unmet needs, this cannot be ignored. Coventry has by far the greatest level of housing need across Coventry and Warwickshire as set out in the HEDNA, with a housing need calculation derived from the Standard Method of some 3,188 dwellings per annum, adjusted in the HEDNA trend-based approach to 1,964 dwellings per annum. Applying the housing need calculated in the HEDNA to the proposed SWLP Plan period suggested from 2022 to 2050 equates to some 54,992 dwellings to be accommodated to meet Coventry’s needs, as a minimum. Coventry is highly constrained by a tightly drawn administrative boundary, with potential for brownfield redevelopment but limited opportunity for greenfield development. This was reflected in the adopted Coventry Local Plan (December 2017), where the local housing need in Coventry in the period 2011 to 2031 was calculated at 42,400. The Coventry Local Plan set a housing requirement of just 24,600 (some 60% of its local housing need), leaving a shortfall of some 17,800 dwellings to be met elsewhere. It is therefore highly unlikely that Coventry will be able to meet its local housing need identified in the HEDNA of 54,992 dwellings to 2050. Even assuming that Coventry can accommodate a proportion of its local housing need consistent with that set out in the adopted Coventry Local Plan (i.e. 60%), which is itself a challenge, Coventry could only accommodate 33,000 dwellings to 2050 leaving a shortfall of some 22,000 dwellings to be met elsewhere. Given South Warwickshire’s functional relationship with Coventry, and as South Warwickshire makes up around half of the population of Warwickshire according to the 2021 Census data early releases , an assumption that around 50% of this shortfall will be directed to South Warwickshire is considered appropriate. This equates to approximately 11,000 dwellings and should be taken into consideration at this stage of the process as a working assumption for the level of unmet need to be accommodated.
No answer given
Yes, Bloor Homes support the allocation of other sites as necessary for short-term development.
Yes, growth of existing settlements in South Warwickshire is imperative to deliver the overall growth targets, and achieve the Vision and overarching principles. The need for housing, affordable and specialist housing, jobs, green infrastructure, improved facilities and infrastructure is within the towns and villages. Those needs are best met sustainably adjacent to the settlements.