Preferred Options

Search representations

Results for Home Builders Federation Ltd search

New search New search

Object

Preferred Options

1. Introduction

Representation ID: 48855

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

It would be helpful if the local plan clearly stated the period of time over which it is intended to operate. This should be stated on the front cover and in the first paragraph of the introduction, as well as elsewhere in the document, including the section that addresses the housing need over the plan period. We assume that the plan period proposed is 2011 to 2029 although this is not altogether clear.

Support

Preferred Options

What is the Evidence to Support Different Levels of Growth?

Representation ID: 48856

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

It is encouraging to see the Council taking the correct approach to establishing a housing requirement that is in conformity with the NPPF (hereafter referred to as the Framework). It is the function of the SHMA to assess the full housing needs of the district over the proposed plan period.

Object

Preferred Options

What is the Evidence to Support Different Levels of Growth?

Representation ID: 48857

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

Concerns about the idea that there is a direct relationship between new jobs in the district and the demand for new homes. The relationship may not be as strong as the Council thinks, and to some extent, the demand for housing in the district will come from people who work elsewhere, typically in the larger employment centres of Solihull, Coventry, Birmingham etc.

Object

Preferred Options

PO1: Preferred Level of Growth

Representation ID: 48858

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

The SHMA indicates that the annual need for affordable housing will be 698 homes per year (paragraph 7.50). This exceeds the proposed option, and, significantly, only addresses the affordable housing need, not the demand for market housing. The report does not appear to have assessed what the market need will be in the district in addition to this affordable need. As such, the SHMA does not satisfy the requirements of the Framework, paragraph 159.

Object

Preferred Options

PO1: Preferred Level of Growth

Representation ID: 48859

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

It is unclear how the three modelled housing scenarios relate to the requirement of the Framework for the SHMA to identify the scale of housing needed over the range of tenures, including housing demand (paragraphs 47 and 159). It is unclear whether the figure of 698 affordable homes per year relates to the three scenarios since it exceeds two of them and is almost comparable to the third. The SHMA needs to set out what the quantity of need is for market housing and affordable housing over the plan period.

Object

Preferred Options

What is the Evidence to Support Different Levels of Growth?

Representation ID: 48860

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

The Council has not explained why it is choosing to discount the evidence of need identified by the SHMA. It would appear that the Council is relying upon the argument that because the SHLAA can only identify land for 11,410 homes (paragraph 5.18). This is a capacity-based approach to determining the future housing requirements. A capacity-based approach would be contrary to the Framework, as the expectation is that the Council will do all it can to meet objectively assessed needs (see paragraphs 14, 17, 47, 179 and 182).

Object

Preferred Options

What are the Options?

Representation ID: 48861

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

2008 based household projections indicate figures comparable to option 2 in Table 5.2 of the plan (12,888 dwellings). The Council suggestion that the employment projection is likely to be optimistic (paragraph 5.22) may be mistaken and consequently housing demand, may be stronger than it expects. If this is the case the plan will need to be sufficiently flexible to respond to rising demand.

Object

Preferred Options

3. The Local Plan Process

Representation ID: 48862

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

Duty to cooperate - if the council is unable to meet its objectively assessed housing need through its plan it will need to plan to ensure that these needs can be met elsewhere outwith the district. To do so, it will need to plan inconjunction with adjoining councils. Solihull and Stratford Councils are proposing lower than SHMA levels of housing and this suggests that Warwick will need to fully accommodate it own housing requirement since it cannot rely on others to allocate additional housing sites.

Object

Preferred Options

The Location of New Housing

Representation ID: 48863

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

It is unclear why the Council feels it needs to phase the delivery of sites (paragraph 7.20). Surely, if all the sites have been assessed as being suitable for housing, and thus sustainable in terms of the Framework, it should be immaterial when these sites come forward for delivery.

Object

Preferred Options

Justification for the Preferred Option for the Provision of Affordable Housing

Representation ID: 48864

Received: 18/07/2012

Respondent: Home Builders Federation Ltd

Representation Summary:

There is evidence in the Council's viability study that setting an affordable housing rate of 35% would appear to be more appropriate than 40%. Work on viability has also not factored in appropriate building standard costs; renewable energy costs; biodiversity and flood mitigation costs. The previous work on viability has also not taken account appropriate BCIS external and landscaping costs. The site acquisition costs are also too low and the planning gain package too modest. These factors together do not support the assertion that either 35% or 40% affordable housing is viable.

For instructions on how to use the system and make comments, please see our help guide.