Revised Development Strategy

Search representations

Results for Environment Agency search

New search New search

Support

Revised Development Strategy

5.1.13 Infrastructure Requirements

Representation ID: 55261

Received: 29/07/2013

Respondent: Environment Agency

Representation Summary:

The environment agency set out detailed technical comments relating to the current modelled flood status of various watercourses affecting sites South of Warwick and Whitnash, and make recommendations for further modelling of flood risks, possibly as part of a Strategic Flood Risk Assessment as development proposals proceed through the planning process.

Notes that the Tach Brook corridor forms part of the River Avon Local Wildlife site. A key objective in planning this area should be to create and enhance its water-based biodiversity and potential for biodiversity in line with the local objectives included within the Severn RBMP. In light of this, the blue infrastructure of the rivers and brooks in the area and their associated riparian habitat should be integral in any green infrastructure planning.

The proposal to include a country park on the southern side of the development is welcome and will hopefully provide an area for rainwater infiltration and a buffer to surface water run off. However, the EA recommend that in order to provide maximum environmental benefits for the Tach Brook, the park should be extended to cover the whole southern perimeter of the development so that the full length of the Tach Brook is afforded the best possible protection from pollution and potential for improvement. As a minimum, the EA would require an undeveloped buffer zone along the river bank which should be informed by site-specific modelling. This would be additional to and not replace the SUDS schemes which should be employed across the entire strategic development plan.


Notes that there are existing surface water flooding problems in the area, as flagged up by concerned local residents in The Malins and Myton Crescent. EA question whether a Surface Water Management Plan would be of use to support these broad allocations, as there may be other areas which have similar concerns. Recommendation Sev 11/8 of the Severn Catchment Flood Management Plan recommends as an action that investigations are undertaken into areas most prone to flooding and that an assessment should be undertaken of the allowable discharge rates from new developments.
.

Attachments:

Support

Revised Development Strategy

5.2.6 Infrastructure Requirements

Representation ID: 56271

Received: 29/07/2013

Respondent: Environment Agency

Representation Summary:

Eastern boundary of the site is within Flood Zone 2 and Flood Zone 3 of the Whitnash Brook. The Sequential Approach to flood risk management outlined within the NPPF and Tables 1, 2 and 3 of the supporting Technical Guide should be applied to ensure that new development is directed towards the areas of lowest risk, and only proposed in areas of floodplain if it is absolutely necessary.

Map 4 shows a Local Wildlife Site buffer along the line of the watercourse and including its indicative floodplain. The EA support this approach to protecting the watercourse and the surrounding Local Nature Reserve as it ensures vulnerable development is steered away from this area of risk and that an unobstructed river corridor is maintained for flood risk and habitat benefit.

Providing that the Local Plan confirms the extent of development will not encroach into Whitnash Brook floodplain (including the medium risk Flood Zone 2 as well as Flood Zone 3) then this should not pose a problem at this stage. Further modelling as part of Level 2 SFRA may be required.

Any works in this location should look to preserve and enhance the ecological status of the river corridor.

Attachments:

Support

Revised Development Strategy

5.3.8 Infrastructure Requirements

Representation ID: 56272

Received: 29/07/2013

Respondent: Environment Agency

Representation Summary:

The site is entirely located within low risk Flood Zone 1 and is situated 750-800 metres away from the River Leam. We therefore have no fluvial flood risk concerns for this site, but we do welcome the proposals within para 5.3.17 to create improved access to the associated wetland habitat creation project.

Attachments:

Support

Revised Development Strategy

5.4.6 Infrastructure Requirements

Representation ID: 56273

Received: 29/07/2013

Respondent: Environment Agency

Representation Summary:

The site is entirely located within Flood Zone 1 and is situated 1200 metres away from the nearest watercourse, the River Leam. We have no fluvial flood risk concerns for this site.

Attachments:

Support

Revised Development Strategy

5.2.6 Infrastructure Requirements

Representation ID: 56274

Received: 29/07/2013

Respondent: Environment Agency

Representation Summary:

Notes that Council's (Halcrow) Water Cycle Study of 2010 makes the following recommendations regarding some of these sites. Severn Trent Water Ltd should comment on these change in development areas and advise as to any considerations that need to be allowed for in terms of foul infrastructure availability and timing.

"Downstream of the Land at South Sydenham and East of Whitnash, Land at Red House Farm Campion Hill and Land North of Milverton there are significant network capacity constraints. Capacity improvements to alleviate this flooding problem are currently being appraised as part of Severn Trent's sewer flooding investment programme. Further hydraulic analysis will be required to assess the impact of this development on sewer capacity. The phasing of development should consider the delivery of this infrastructure."

Attachments: