Preliminary Draft Charging Schedule

Search representations

Results for Canal & River Trust search

New search New search

Support

Preliminary Draft Charging Schedule

CIL Preliminary Draft Charging Schedule

Representation ID: 53128

Received: 17/07/2013

Respondent: Canal & River Trust

Representation Summary:

The inclusion of the canal infrastructure as a requirement for walking and cycling infrastructure is welcomed. However, apart from the traditional role of the canal as a system of travel or transport the canal has a variety of roles, including: a catalyst for regeneration; a contributor to water supply, drainage and flood management; a tourism, leisure and recreation resource; heritage landscape, open space and ecological resource; sustainable modes of transport; and routes for telecommunication. As such, rather than incorporate the canal as part of generic 'walking and cycling' infrastructure, specific projects for the canal should be included.

For instructions on how to use the system and make comments, please see our help guide.