Publication Draft Local Plan: Focused Consultation

Search representations

Results for Europa Way Consortium search

New search New search

Object

Publication Draft Local Plan: Focused Consultation

3 - DS14

Representation ID: 67232

Received: 16/12/2014

Respondent: Europa Way Consortium

Agent: AMEC

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Opposed to the proposal for a new Community Stadium and "associated uses" on Land at Myton/West of Europa Way. Whilst the District Council and other stakeholders may wish to see Leamington FC relocate their existing stadium, the Consortium is not aware of any detailed proposals for, or evidence base to support a new 'Community Stadium' at this location. The site for the stadium is not only in a location which we feel would raise amenity concerns for existing and future residents, due to visual impact, noise and traffic, but it is also proposed is in a location which is at odds with other policies in the Draft Local Plan, in particular Policy CT1 which encourages such facilities to be located in town centre locations.

Attachments:

Support

Publication Draft Local Plan: Focused Consultation

5 - Policies Map - E1

Representation ID: 67448

Received: 16/12/2014

Respondent: Europa Way Consortium

Agent: AMEC

Representation Summary:

Supports removal of land allocated for employment in the Publication Draft at Land at Myton / West of Europa Way. Whilst the site does sit adjacent to Warwick Technology Park (WTP), there are no existing pedestrian or vehicular links between the two and, given existing development on WTP and local topography (WTP sits in a 'bowl'), there is no recognised prospect of any being established in the future. Therefore we strongly disagree with previous suggestions that having employment in this location would serve as a natural extension the existing Technology Park.
Contends that there will not be the market for additional employment land in this part of the District, during the first phase of the Plan. An argument supported by the Council's recent decision to grant planning permission for housing on allocated employment sites, including a site located opposite off Heathcote Rd/ Harbury lane.
A delay in the take up of employment land on the Strategic Site it could have a detrimental impact on the wider proposed urban extension, in particular the delivery of new infrastructure including a proposed spine road which would link Gallows Hill (road) with Europa Way (A452). The spine road is not only proposed as a public transport (bus) route, but would provide convenient pedestrian and cycle access for those children from the Warwick Gates area who currently attend Myton School or would attend the School in the future.
A major employment allocation at this location would also generate significant traffic movements and therefore would be detrimental to opportunities to secure safe and convenient pedestrian and cycle access to Myton School for children in the wider area, but in particular those from Warwick Gates and the planned urban extension south of Harbury Lane.
A major employment allocation at this location is considered incompatible with residential proposed on the same site. In particular the amenity of residents is likely to be compromised in terms of visual impact, noise and traffic especially at peak periods.

General Industrial (B2) employment is considered incompatible with B1 uses and clearly at odds with the Council's stated reason for allocating employment in this location (paragraph 2.32). Having B2 on the same site as B1 will dissuade most high-tech office based companies from investing in the site because they would be concerned over the type of neighbouring employment use which might come forward at a later stage.

The southern end of Land West of Europa Way commands an elevated position compared to land to the north, west and south. It is therefore considered that the visual impact of large offices will be harder to mitigate than 2 to 3 storey houses which offer more flexibility in terms of mitigating their visual impact through the physical arrangement of units/ roof lines and tree planting throughout the site and other screen planting.

Attachments:

Object

Publication Draft Local Plan: Focused Consultation

6 - Policies Map - H01

Representation ID: 67449

Received: 16/12/2014

Respondent: Europa Way Consortium

Agent: AMEC

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

No change has been made to the housing allocation at Land at Myton / West of Europa Way on Policy map 2. Policies Map: 2, in both the Publication Draft and Focused Consultation versions of the Local Plan depicts all of the Land at Myton/West of Europa Way (Strategic Site) as being allocated for residential, with other land use allocations overlapping, such as those for employment, community hub/stadium and/or education. The Policies Map should not have the same area of land allocated for different land uses unless a dedicated mixed-use scheme is proposed, which, in this case, it is not.

Attachments:

Object

Publication Draft Local Plan: Focused Consultation

7 - Policies Map - DS14

Representation ID: 67450

Received: 16/12/2014

Respondent: Europa Way Consortium

Agent: AMEC

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

For reasons set out in our response to Proposed Modification reference # 3, the Europa Way Consortium does not support the allocation of Land at Myton/West of Europa Way for a sports stadium and therefore requests that the allocation is deleted from Policies Map: 2 Land at Myton/West of Europa Way

Attachments:

Object

Publication Draft Local Plan: Focused Consultation

8 - Policies Map - ED1

Representation ID: 67452

Received: 16/12/2014

Respondent: Europa Way Consortium

Agent: AMEC

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

The boundary for the Major Education Allocation' (DS12) on Land at Myton/West of Europa Way is incorrect on Policies Map: 2 in both the Publication and this, the Focused Consultation, Draft versions of the Local Plan. Historically the Consortium has been informed by WDC and Myton School that 9.18 hectares (22.3 acres) of land is needed south of the existing school boundary to deliver the proposed new Education Campus. To help facilitate this, the Consortium and WCC-Property (who own the adjacent site) have agreed to safeguard the following: 2.06 hectares (5.4 acres) on County Council held land with the balance 7.12ha (17.3acres) being safeguarded by the Consortium. These respective areas and proposed amendments to the policy boundary are shown on the attached plan and align with Illustrative Masterplan for outline planning applications Land at Myton (Application No. W/14/1076; approved 5/12/14) and Land North of Gallows Hill (Application No. W/14/0967).

Attachments:

For instructions on how to use the system and make comments, please see our help guide.