BASE HEADER

Preferred Options

Daeth i ben ar 3 Awst 2012

Appendices

(1) Map 1: District in Context

(4) Map 2: Potentially Suitable Urban/Edge of Urban Sites

(3) Map 3: Preferred Options (Whole District)

(5) Map 4: Development Sites – Preferred Options (Urban Fringe)

(6) Map 5: Possible Transport Infrastructure

(2) Map 6: Possible Green Infrastructure

Am gyfarwyddiadau ar sut I ddefnyddio’r system ac I wneud sylwadau, gwelwch ein canllaw cymorth.
back to top Yn ôl i’r brig